345 Fulton Street
Hayes Valley · San Francisco, CA 94102
-
1926
Built.
-
Mar 1983
Additions alterations or repairs.
-
Nov 1989
Ewo ( s ).
-
Sep 1993
Reroofing.
-
Oct 2007
Work on one unit. kitchen upgrade, kitchen cabinet, sink, countertop, flooring. bathroom upgrade tub tile, 1 flooring and minor drywall repair. no structural work -50% fluorescent lighting, kitchen fluorescent bath or manual on auto off switch.
-
Apr 2013
Work at two units: replace old kitchen cabinets with new, new counter & tiles, new bathroom tile floor & tub surround. no new wall and no wall relocation. lighting in kitchen and bathroom remodel shall comply with cec 150(k)8 & 150(k)10 respectively.
-
Jul 2015
A remodel of the 1st floor to include 2 new studio units to the rear. relocation of the boiler room & laundry room, gas meters & electrical meters. entire 1st floor must be sprinklered to nfpa 13. fire alarm and sprinkler system under separate applications.
-
May 2017
Upgrade electrical in one unit remodel bathroom.
-
May 2017
#25, 35, 44, 45, 46, 56- remodel 6 kitchens & (6) baths, update electrical & plumbing. paint common areas.
-
Jun 2017
Two units: rehabilitate kitchen, rehabilitate bathroom, update electrical to code & update plumbing to code. no structural work. all walls to remain.
-
Aug 2017
One unit: rehabilitate kitchen & bathroom. update electrical and plumbing to code. maher na.
-
Aug 2017
One unit: remodel kitchen, bathroom, no changes to wall locations. update electrical & plumbing to code.
-
Jan 2018
Kitchen remodl, no chang in wall & opening lyaout. local wall opening and patch up associated with upgrade.
-
Apr 2018
Reroofing.
-
Aug 2018
One unit: opening dry walls, rough electrical and final, closing back dry wall when all done. maher n/a.
-
Jan 2019
Voluntary upgrade of fire alarm system with additions of low frequency sounders in all sleeping areas.
-
Mar 2019
One unit: rehabilitate existing kitchen, bathroom and install washer/dryer.
-
Apr 2019
Kitchen/bath remodel for one unit. total sq ft is 400 only about 75 sq ft remodeled. no structural - no framing alterations.
-
Oct 2019
One unit: kitchen remodel. r/r bathroom tile floor. unit previously remodedl with plumbing/electrical/building. maher n/a.
-
Oct 2019
One unit: kitchen floor repair & bathroom repair floor tile. repair/replace dry rot if applicable. unit previously remodel with plumbing/electrical/building.
-
Feb 2020
One unit: remodel 1 existing kitchen & 1 existing bathroom in kind. remove & replace drywall as necessary to update electrical & plumbing. no structural changes. no alteration of wall, window or door.
-
Jul 2021
#53. remodeling kitchen, remodeling bathroom, no structural works.
-
Jul 2021
#45. remodeling kitchen, remodeling bathroom, no structural works.
-
Jul 2021
One unit: convert existing kitchen to nook, rehabilitate existing kitchen, rehabilitate existing batroom, install washer and dryer.
-
Jan 2022
One unit: convert existing kitchen to nook. rehab existing kitchen. install washer/dryer.
-
May 2022
Addition of three adu units at the ground floor per the local adu program for a total of 31 units. modification of sprinklers at work area as required and under a separate permit; entire ground floor assembly to be upgraded to a 1-hour assembly per information sheet fs-05.
DBI holds 31 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 31. 1 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 337 Fulton Street Same street
- 355 Fulton Street Same street
- 455 Franklin Street Same block
- 300 Grove Street Same block
- 355–357 Grove Street Around the corner
- 361–365 Grove Street Around the corner
- 537–539 Gough Street Around the corner