725–785 Fulton Street
Hayes Valley · San Francisco, CA 94102
-
1970
Banneker Homes, developed jointly by Macedonia Missionary Baptist Church and Friendship Institutional Baptist Church in the redevelopment era.
-
Oct 1983
Repair walls & roof patch up sheetrocks, kit. cab. & ceiling.
-
Apr 1986
Kitchen; remove sheetrock, cabinets, sink & counter top.
-
Apr 1992
Reroofing.
-
May 1994
New const. install fire sprinkler system.
-
May 1996
Install security fences & gates for pedestrians & vehicles.
-
Sep 1999
Repair deck.
-
Jun 2006
Replace windows in kind, exterior stair railing & treads, electrical fixtures, plumbing fixtures, balcony boards decking, paint interior & exterior, replace cabinets. replace roofing, replace flooring, lighting in kind replacement only.
-
Jun 2006
Replace windows in kind existing. stair railing & treads, electrical fixtures, replace cabinets, roofing, flooring, lighting-in kind replacement only.
-
Jun 2006
Replace windows doors cabinets flooring electrical fixtures balcony decking plumbing fixtures paint int. and exterior, replace stair railings (exterior) and treads replace roof lighting in kind replacement only.
-
Jun 2006
Replace windows in kind ext. stair railing & treads, electrical fixtures, plumbing - fixtures, balcony boards of decking, paint int & ext. replace cabinets, replace roof, replace flooring. lighting - in kind replacement only.
-
Jun 2006
Building a-replace windows, ext. stair railing&treads, electrical&plumb fixtures, balcony decking, paint int.&exterior, cabinets, roofing, flooring.to comply with housing insp. notices of violation issued on 06/21/99&10/28/05.complaint # 199922847&200563971 to complete all wk.req by attach notice.lighting in kind.
-
Jun 2006
Building b - replace windows, ext. stair railing & treads, electrical fixtures balcony decking, plumbing fixtures, paint int. & exterior, cabinets, roofing, flooring, lighting-in kind only.
-
Jun 2006
Building c - exterior & interior painting.replace ext stair rails, kitchen cabinets, all fixtures, all flooring, all plumbing fixtures, doors, boards on deck, windows in kind, roofing, lighting in kind only.
-
Jul 2006
Interior alteration to 4 apartment units to enlarge a bathroom. not structural change, non bearing partition walls removed. two units in both.
-
Aug 2006
Reroofing.
-
Oct 2006
To erect one story new building.
-
Nov 2006
To erect 1 story assembly & office building.
-
Feb 2007
Interior alterations to apt# one unit to enlarge bathroom. add / relocate door & add window. construct exterior ramp at rear of apt# one unit.
-
Feb 2007
Interior alterations to four units. units to enlarge bathrooms. add / relocate door & add 4' x 5' window. exterior ramps at rear of units. revision to permit application 2006/07/13/6444.
-
Mar 2007
Install new fire alarm system for existing complex.
-
May 2007
Installation (reconstruction) of fire proofing at ceiling. no mechanical under this permit.
-
Nov 2007
Fire proofing revision to permit application 200705312631.
-
Nov 2007
To add a new retaining wall (6' high) to an existing retaining wall at rear of new building. revision to permit application 2006.11.29.8741.
-
Jan 2008
Work on 765 fulton street - installation of fire proofing on ceiling/beams in parking garage on 765 fulton. installation of fire stopping material around all openings at existing concrete deck and unrestrianed beams. revision to permit application 2007.05.31.2621 and 2007.12.18.0738.
-
Sep 2017
Repair concrete deck > 50 % repair steel beams.
DBI holds 49 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 49. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update