64–78 Gough Street
Hayes Valley · San Francisco, CA 94102
Permit history
-
Nov 1983
To remove previous abatement, new roof was installed.
-
Feb 1989
Fire repair.
-
Mar 2000
Seismic retrofit of existing urm building, bolt procedure.
-
Jul 2000
Street space.
-
Sep 2001
Street space.
-
Aug 2004
Remove walls.add bar.exist hot water heater&heating&sprinkler system to remain.sp sys under seppermt.
-
Jan 2005
Remodel bsmnt for private party dinning area/remodel st level for additional seating to enlarge.
-
May 2006
Expand existing dining room into adjacent, unoccupied space and restrooms, new finishes. mep separate permits.
-
Jun 2007
Two units - kitchen & bath room remodel- new cabinets, kitchen floor, new tub and bathroom tile floor.
-
Apr 2008
Reroofing.
-
Sep 2009
Reroofing, no skylights.
-
Aug 2010
Provide repairs to 2 wood beams surrounding an (e0 skylight at the 3rd level ( ceiling of 2nd level) per the 2007 sq ft building code. the building was previously seismically retrofitted with steel braced frames at the 1st level.
-
Nov 2010
Expansion of exisitng a-2 occupancy restaurant, "espetus churrascaris" into an adjacent space serve as an additional dining room. several existing wall, floor & ceiling assemblies, upgrade to bring fire resistance ratings up to code. install new fire door between existing restaurant & new expansion.
-
May 2013
T.i on the existing 2nd fl office space for espetus restaurant administration. including 4 offices. 1 conference room. break room. reception area & remodel exist. single restroom.
-
Nov 2018
Bathroom remodel (existing). replace existing fixtures. no sink work. replace tile, walls, gfi and exhaust fan. sro bathrooms 40 sq ft. two units. no wall modification. no structural work.
-
Jan 2019
One unit: kitchen and bath remodel no structural/no exterior works no changes in wall layout. all work within unit. no fire alarm or sprinkler work required (no change of existing floor plan.
-
May 2019
Remove and replace exhaust and add filtration system.
-
May 2019
Revision to 201905039640. planning review missed on original permit. route to planning for approval.to verify existing ductwork on rose alley must be used.
-
Sep 2019
1 kitchen and 1 bath remodel. no structural changes. no change to wall layout. all work in one unit. kitchen: 72 sq ft, bath: 40 sq ft.
-
Jan 2020
Fire alarm: new wireless swift gateway (with 2 smokes, 1 relay, 6 strobes, 6 horn/strobes, 4 pulls) to be added to existing facu (replace 11 smokes, 1 duct detector, 6 modules, 9 strobes, 12 horn strobes, 7 pulls). ref app#201905039640.
-
May 2020
Accessible entrance program to existing commercial units per ordinance 51-16.
-
Oct 2020
Install new equipment screen to reduce noise eminating from the rooftop equipment (refer permit application 201905090211) on north side of building facing rose st.
-
Jun 2021
Install ul300 ansul fire system to protect kitchen hoods, cooking equipment, and pollution control unit. reference permit # 2019-0509-0211.
-
Aug 2021
Reroofing.
-
Jan 2025
Install low frequency horns in all sleeping areas to comply with 1103.7.61.
DBI holds 83 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 83. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. Submit an update