Church
-
1922
The Emanu-el Sisterhood Residence, designed by architect Julia Morgan, who built widely for women’s organizations.
-
1922
The Emanu-El Sisterhood School, designed by Dorothy Wormser Coblentz in Julia Morgan's office; it housed Jewish women refugees during the Second World War.
-
1960s
The San Francisco Zen Center, which grew out of the Japantown temple and became a major Buddhist institution in the Bay Area.
-
1969
The San Francisco Zen Center bought the Julia Morgan-designed Emanu-El Sisterhood building here in 1969 for its City Center. Built to shelter single Jewish women, it could house seventy-five residential students practising zazen four times a day.
-
Feb 1993
Parapet reinforcing.
-
Aug 1996
Remove existing window grille and with replace opening grill.
-
Sep 1996
Reroofing.
-
Mar 1997
Remove existingexhaust ventilator/install new canopy exhust greas.
-
May 1997
Install a hood/duct fire system into the hood.
-
Mar 1998
Replace/install chain link fence around building/accessible ramp.
-
Mar 2005
Install solar electric panels on roof. oinstall ac/dc inverter. ac & dc disconnect switches. wire.
-
Apr 2008
Install new ul 300 rated ansul fire system in the kchn on the 2nd floor. 1 pull station, 3 detector, 1 gas valve, 1 3 gal tank, 1 automan.
-
Jan 2014
Replacement in-kind of two french doors panels and sidelites along primary facade of building, - using typical old fashiioned window ogee & 1/4" laminated glass.
-
May 2014
To obtain final inspection for work approved under permit application 200204194495.
-
Apr 2022
Accessory change of use r-2 with r-1 establishing of hotel use in 5 guest rooms on the first and third floors. (no work perform) cfc required.
-
Jun 2022
To obtain final inspection for work approved under permit application 9414249. all work is complete.
-
Dec 2022
Sq ft zen center modernization and ada upgrades. work includes renovated ada upgrades @ page st, new elevator, new interior lift adj to laguna entrance. new restrooms @ each floor, upgraded mechanical ventilation at zendo basement level. to comply with his nov 201470281 - ada upgrades/grab bars. mep deferred.
-
Aug 2023
Deferred mep for 202212168528.
-
Nov 2023
Revision to bpa#202212168528, add smoke detector access hatch to elevator hoistway per sffd ab 2.01.
-
Jan 2024
Fire alarm system: new facu installed in baseent and a new remote annuniator in 1/f entry. 2-way comm system in main base station install in basement near facu. refhhhhh t.i. 202212168528.
-
Jan 2025
Install (10) fire sprinklers in rooms labeled "hotel" ref: permit application 2022-0422-2769.
-
Feb 2025
Install emergency responder radio coverage system.
-
Mar 2025
Ref 202502261158-addition to existing edward fire alarm system to monitor new errcs to provide dedicated led errcs annunicator adjacent to existing fire alarm system.
DBI holds 31 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 31. 6 of them are nominal $1 street-space or sidewalk permits. 5 expired permits are not shown.
Nearby
- 294 Page Street Same street
- 308–310 Page Street Same street
- 340 Page Street Same block
- 302–304 Lily Street Same block
- 308 Lily Street Same block
- 300 Lily Street Same block
- 289 Lily Street Around the corner
- 253–263 Laguna Street Around the corner