11–35 Van Ness Avenue
Hayes Valley · San Francisco, CA 94102
-
1911
Built as the Masonic Temple, steel-framed and of concrete, to a Venetian Renaissance design by Bliss & Faville.
-
May 1982
Building use: commercial.
-
Dec 1982
Additions alterations or repairs.
-
Oct 1983
Installation of fire sprinkler system.
-
Jul 1984
Restaurant tenant improvement remodel existing space.
-
Aug 1984
Provide office under building permit #8210354.
-
Jan 1985
Provide 15, 000 s.f. of tenant office sspace, 4, 000 s.f.
-
Aug 1985
Video production facility to be built in lower level.
-
Jan 1987
Demolition of exist. partitions, new demising.
-
Feb 1988
New gyp partitions, hvac, clg. grid, sprklrs, electrical.
-
Jun 1992
Cti-1 8th floor (el, me, sp).
-
Jun 1992
Cti-1 4th floor (el, me, sp).
-
Jul 1993
Tenant improvement to toilets, tenant spaces.
-
Sep 1999
Provide title 24 restrooms, change partial interior layout.
-
Aug 2000
Oti-1, 2nd floor, el, me, ls, sp.
-
Aug 2006
Installation of new roof. higher than 0.70 reflectance, higher than 0.75 thermal emittance.
-
Feb 2007
Oti-1 7th floor el, l/s (suite #700).
-
Feb 2007
Demolition of coffee station casework, sliding door and patching of adjacent finished, construction of new glazed partition, painting new and weexsiting walls and soffits, constuction of new cross corridor dorrs (oti-1=6th floor, el, ls.
-
Nov 2009
Permanent cooling for 3 servers rooms. furnish and install 3 water cooled heat pumps to provide permanent cooling to meet the process heating loads on the 3rd, 4th, and 5th floor server rooms.
-
May 2011
T.i of the 1st, 3rd, 5th & 6th floors of 25 van ness ave.interior alternation/renovation including architecture, structural, mechanical, plumbings and electrical work.
-
Jun 2016
Minor renovation of existing theater lobby to include new paint, carpet, furnishings, replace lighting and repair sprinklers. minor partition adjustment.
-
Aug 2016
Replace sub side walk basement roof at sw corner of van ness and oak st nw corner of hickory and van ness.
-
Nov 2020
Grindings of sidewalk pavement and re-apply waterproofing on sidewalk to protect basement rooms. (non structural pavement only).
-
Jul 2022
Tenant improvement of 27 van ness suite with demolition and construction scope for wall partitions, flooring, ceilings, finishes, as well as related mechanical, plumbing, fire protection, and electrical work.
-
Nov 2022
7/f: selective demolition of interior partitions, construction of new partitions, new lighting, new finishes, new plumbing in breakroom, ada upgrades in restrooms, new power and data receptacles.
-
Sep 2024
Project consists exclusively of elevator modernization of two traction elevators (elevators #1 and #2) and one hydraulic elevator (#3) at 25 van ness ave.
DBI holds 168 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 168. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. Submit an update