Sep 1989
Approx. 3700 sq ft. of new office space renovation.
-
May 1991
Acoustic modifications.
-
Dec 1991
Phase ii of ongoing acoustic improvements & mis. renovations.
-
Jan 1992
Convert existing terrace levl rm to box seating area lounge type.
-
May 1993
Minor demolition/new partit/ceilings & millwork 2nd fl admin.
-
Apr 1994
Alteration to existing storage and piano room no extension.
-
Jul 1998
Reroofing.
-
Aug 1998
Replace existing fire alarm system with new fire alarm system.
-
Dec 1998
Install 2000 gallon above ground diesel storage tank.
-
May 1999
Replacement of existing fire alarm system.
-
Aug 2001
Revise to app #9910089 phase i phase 2 consist of completion the sym for entire building.
-
Jan 2003
Replace existing fire system. this permit is for device location, complet shop plans will be submite.
-
Apr 2003
5th floor - hvac controll upgrade througout entire buiding.
-
Jun 2004
Installation of safety rails.
-
Nov 2004
Installation of safety rails.
-
Aug 2005
Replace ballet floor & ada work including plumbing fixtures, signage, toilet accessories, handrails.
-
Apr 2010
Architectural barrier removal @davies symphony hall: 1-existing restroom modifications-grove st. lobby; 2-interior(one)ramp modification serving terrace level audience seating; 3-install one new accessible drinking fountain.
-
May 2010
Davies symphony hall, boiler upgrade, chiller upgrade, vfd, piping retrofit. intake and exhaust louvers. new openings in concrete wall with reinforcing for louvers.
-
Jul 2011
To erect electrical sign.
-
Jul 2011
To erect electrical sign/wall mounter display cases.
-
May 2012
Remove & replace approx 1500 sq ft of sheetrock due to water damage. replace existing flooring in kind. all work in basement chorus rehearsal room "c".
-
May 2013
Demolition existing office and convert to two ada accessible toilet rooms. build new ada compliant ramp. install new damper in existing hvac. electrical upgrade.
-
Jul 2015
Reroofing. tear off 1 layer bur and install 140 sq ft 1/2" densdeck cement board and 60 mil duro-last pvc roofing.
-
Jul 2023
Revision to bpa#201803274726 & 202210204766, additional drawings for elevator #1 & #2 modernization.
DBI holds 71 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 71.