1750 Alameda Street
Mission Bay · San Francisco, CA 94103
-
1948
Built as the Graybar Electric Co. warehouse.
-
Nov 1983
Sign - erect.
-
Nov 1989
New corridor on 1/f.
-
Dec 1994
Sign.
-
Apr 2000
Seismic upgrade/ti new mechanical & electrical sym new fire sprinklers facade alt new roof deck and roof screens.
-
Apr 2000
Provide interior demolition per plans.
-
Apr 2000
Seismic upgrade all access under 200004056394s struct only.
-
May 2000
Fire protection ti 1st floor.
-
Jul 2000
T/i mechanical only submit separate permit for electrical.
-
Aug 2000
Install a glass wall with sprinklerin in lieu of an enclosed stairwell revise to site.
-
Sep 2000
Install fire sprinklers on all floors - (new calc-system).
-
Oct 2000
Install new life safety system, panel, annunceator, strobe, horns, smoke detector.
-
Apr 2007
Minor remodel including creating 1 hour corridor on ground floor, creating elevator vestibules on 2nd & 3rd floors. closing off decorative stair on all three floors. mep to be design build under separate permit.
-
Apr 2008
2nd floor-remove walls at small conference, install open stud partitions, new finishes at interior partitions, add refrigerator, dishwashers and millwork to break room, remove & install lights in selected areas, install new workstations and furniture.
-
May 2008
Renovation of existing office on third fl, work to include minor demolition and build out. new reception area, new demountable resin partitions, new full height partitions in office 336a & 336b, new finishes in minimal areas. title 24 under separate permit.
-
Apr 2011
Interior ti of an existing office space on the 2nd floor. new partitions, finishes. mep, life safety and fire sprinkler under seperate permit.
-
Aug 2011
Ground floor & 3rd floor - demolitoin of portions of interior walls, ceiling & flooring. t.i. under separate permit. per ab-017.
-
Sep 2011
1st & 3rd floors-interior tenant improvement for an existing shell to include new partitions, flooring & paint. m.e.p work under seperate permit, design/build permit. scope of new work at street level & 3rd floor. existing shell & structure to remain as is.
-
Oct 2011
Add one vav box. relocate ducts and registers.
-
Sep 2019
Replace 1 heating hot water boiler, distribution pumps and misc hydront accessories. n/a for maher.
-
Sep 2019
Reroofing.
-
Mar 2021
Soft demolition only per ab-017. demolition of non-structural partitions ceilings, lighting, millworks, & any associated m.e.p., fire sprinklers, to be modified in accordance with requirement for open ceilings under separate submittal.
-
Apr 2021
Removal of existing ground floor roll up doors and warehouse swing door. installation of new ground floor glass roll up and fixed storefront window in existing rough opening. removal of 11 existing 3rd floor windows and replace with new enlarged window openings.
-
May 2025
Full building renovation and change ofuse from office to private school (k-12) and group e childcare (+36mos).existing on-site parking convert to outdoor play yard for students. mandatory seismic upgrade.
-
Nov 2025
Relocate 117 pendents and 7 uprights on the ground floor. relocated 132 pendent, 13 uprights and 17 window sprinklers on the 2/f. relocate 103 pendent, 17 uprights and 14 window sprinkler on 3/f. new standpipes with fhv near stair 1 & 2 calcs included. hydraulic cals incld flex heads. ref permit application 2025042853.
-
Jan 2026
Full t.i. for the building and occup. change from b class to e class. add a voice evac system to the existing fa system. adding full voice evac. notification system throughout. a total of 10 pull stations, 18 duct detectors, 15 smoke detectors, 1 heat detector will be added. ref permit application 202504285348.
DBI holds 66 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 66. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update