101 Henry Adams Street
Mission Bay · San Francisco, CA 94103
-
1906
Built for the San Francisco Development Company as the northernmost of three near-identical brick warehouses on the block, designed by Meyers & Ward. Known as the Bernhard Mattress Company and John Hoey warehouse.
-
1974
Bought together with the warehouse next door and converted into the Galleria Design Center.
-
1975
Built as a commercial building, associated with San Francisco Design Center.
-
Feb 1983
Additions alterations or repairs.
-
Mar 1992
Express p/c new inter part.
-
Sep 1993
Inter ten improvement in existing space-enterprise zone.
-
Mar 1998
Seismic retrofit, include access compliance information.
-
May 1999
Interior renovat of existing space electrical gen const. plumbing.
-
Nov 2004
Construct new mezzanine space, new partition, non finish sprinkler modification work shall be design.
-
Nov 2006
Relocation of disabled access ramp, construction of mezz level, cosmetic remodel of building entry w new tbar ceiling and flooring.
-
Feb 2010
Demolition of existing non-bearing walls and soffits. construct new non-bearing walls. soffits & floor finishes. mep under separate permit.
-
Sep 2010
2nd floor tenant improvement, new display partitions storage rooms, and t-24 lighting.
-
Feb 2011
Construct of new display partitions, storage rooms, lighting and structural. soffit for recessed lighting.
-
Nov 2013
3rd floor interior remodel of 2872 sq ft including new walls, lighitng, electrical, hvac & finishes.
-
Jan 2014
#101- commercial tenant improvement at 1/f suite of existing showroom building., construct new display partitions, office and storage room within existing showroom suite, compliance with ordinance no. 155-13 not required.
-
Aug 2016
Suite 130: interior improvements including partitions, doors and finishes with minor mechanical/electrical. life/safety work under separate permit. new ada restroom. existing shwroom will remain showroom; no office for this permit. maher ord 155-13 not required.
-
Aug 2016
Ti for suite 218 installation partition walls and decorations for furniture showroom. mep deferred.
-
Dec 2016
Suite 255: remodel existing building space consisting of removal of e interior non load bearing walls, doors, and non structural headers, relocate existing power and data outlets from walls being removed to existing walls. all existing circuits and data port to remain same. accessory 12x14 office to showroom.
-
Apr 2018
Non load bearing walls, millwork, service counter, new doors, mep under sep permit maher na.
-
Jul 2018
Ref permit application 201804196786; interior lighting.
-
Oct 2018
Interior build out of 2nd generation showroom within a multi-tenant mercantile building, partition construction, new millwork construction, installation of new ceilings and light fixtures, intallation of power and communication devices, installation of new store front design.
-
Nov 2019
Reroofing.
-
Jun 2020
Replace one heating hot water boiler, primary pumps, and misc. hydronic accessories.
-
Sep 2021
Suite 144: t.i.-new non bearing partitions/finishes-install appliance/millwork/new electrical upgrade - hvac system and venting to exterior - demolition prep kitchen - lighting design - enclosing mezzanine existing with glass partition. mep deferred.
-
Feb 2022
Reference permit application 202109239008. new tenant interiors for suite 100g on ground floor within existing galleria design center. mep, life safety, sprinklers all under separate permits.
-
May 2022
3rd fl - new tenant suite second egress exit. new rated exit corridor, exit door and brick wall opening. this is not an accessible entrance, see accessible path of travel sheets included for reference only.
-
Aug 2023
Ste 270, 272, 273 & 256, interior ti @ 2nd floor. new non load bearing partitions & finishes. install showroom appliances with millwork.
-
May 2026
Ste: 300 - tenant improvement to existing unoccupied showroom space. no structural work. improvement include new partitons, entry doors, lighting, heat pump, sinks, casework.
DBI holds 224 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 224. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update