2–98 Henry Adams Street
Mission Bay · San Francisco, CA 94103
-
1915
Built as the Dunham, Carrigan & Hayden Co. warehouse, designed by Leo J. Devlin, with brick used for the exterior work.
-
1970
Bought by Henry Adams and converted into the San Francisco Design Center, the first of the conversions that gave Showplace Square its name.
-
Mar 1982
Additions alterations or repairs.
-
Oct 1997
Umb seismjic upgrade structural.
-
May 2002
Expansion /remodel existing furniture showrm. some sprinkler modifications required. all interior work.
-
Mar 2017
Demolition only including existing non load bearing partitions, doors, lighting, finish flooring. no structural work involved. disabled access work related to this construction is being done under app#201610079829. n/a for maher.
-
Jun 2018
Construction of electrical risers from ground fl to central building core electrical & telecomrooms on 4th & 5th fls; new mechanical rooftop units and duct shafts connecting to 4th & 5th fl. mep included. this permit is submitted under ab-017 unoccupied space. conduit through 1, 2, 3rd floor.
-
Jun 2018
Construction of new south restroom core on 4th and 5th floors. remodel north restroom core on 4th & 5th floor. mepk included. this permit is submitted under ab-017 unoccupied space. n/a for maher.
-
Jun 2018
Demolition of interior finishes, casework, ceiling assembly and light fixtures and non load bearing partitions only. submitted under ab-107 for unoccupied spaces. tenant improvement and life safety/sprinklers under sep permit maher na.
-
Sep 2018
Elevator retrofit demolition of existing elevator system & shaft, new elevator. new elevator lobby. new roof, new walkway pad. curbs, new roof deck. new penthouse interior stairs.
-
Nov 2018
Fit out of 4th fl. space with speculative suite walls, millwork, mechanical and electrical systems. n/a for maher.
-
Dec 2018
Interior tenant improvement of partial 5th floor including partitions, millwork and finishes. m.e.p and life safety under separate permit.
-
Feb 2019
Renovation of tenant space (floors 1 & 2m) and lobby. includes the expansion of the existing level 1 toilet core, adding two designated ada, unisex toilet rooms. relocate stairs. no exteriors work. no refacing frams, mulions or glazing at window.
-
Feb 2019
Construction of new south restroom core on floors 4 and 5. remodel north restroom core on floors 4 and 5. permit submitted under ab-017, unoccupied space. fire/life safety under sep permit.
-
May 2019
Partial tear-off. install 1/4" dens deck and attach 60 mil sarnafil s327 reflective gray roofing system.
-
May 2019
Gr fl showroom renovation including new partitons, electrical, plumbing, interior storefront.
-
Sep 2019
4th fl - interior construction of new non-load bearing partitions, glazing, doors, millwork. fire life safety and mep will be deferred submittal.maher n/a.
-
Sep 2019
5th fl - interior construction of new non-load bearing partitions, glazing, doors, millwork. fire life safety and mep will be deferred submittal.
-
Oct 2019
L5 - 5th fl "a bay" interior construction, new non load bearing partitions, glazing, doors, millwork, lighting, mep.
-
Oct 2019
Level 5 - deferred mep submittal for pa 2019-0911-1376.
-
Oct 2019
Level 4 - deferred mep submittal for pa 2019-0911-1373.
-
Sep 2020
T.i.: new example toilet room, new display showroom, display fixtures, updated lighting, relocate mechanical with new underfloor distribution, ex. residential kitchen, boh & new interior storefront falling coorider. all floors, ceilings & walls to be remodeled & exterior storefront shall remain.
-
Oct 2020
Revision to permit application 2018-0913-9936: new roof deck and exit path walkway, extensin of stair #2 to roof. fire/life safety, mep, sprinkler under separate permit.
-
Dec 2022
1-3/floors: modification of existing e3 (gaemwell/fci) fire alarm system, new speaker strobes in all existing tenant spaces only per sffd requirement.
-
Oct 2023
3/f: construction of new restroom cores-in addition to mep, architectural and structural base building infrastructure upgrades throughout the building- new shaft construction and goes thru room from 1st floor-shafts will house outside airducts relief air duct and refrigerant piping services floor 1&2.
-
Jun 2026
4th & 5th fl - includes demolition of non-struc'l partitions on 4th 5th fl in select area new lights, new carpet, paint and acoustic wall panels and refreshing existing millwork. all new or revised meps and life safety work will be deisng build and submitted separately. (building is fully sprinklered) pdr.
-
Aug 2026
4/5/fl- ref ti 202606294074 deferred meps.
DBI holds 328 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 328. 8 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update