450 Irwin Street
Mission Bay · San Francisco, CA 94107
-
1951
Built as the Greyhound Bus Lines garage, designed in 1950 by Skidmore, Owings & Merrill: an unusually complete application of the International Style to a utilitarian building, and one of the most architecturally significant buildings of the immediate postwar years in the district.
-
Oct 1995
Non-structural demolition of office partitions.
-
Nov 1995
Remodel existing building, new restroom, elevator and struct.
-
Jan 1996
Structural upgrade of existingbuilding.
-
Jun 1997
Seismic retrofit only.
-
Dec 1997
Relocate rest rooms, #9710045.
-
Feb 1998
New fire sprinkler system in eq retrofitted building.
-
Apr 1998
Reroofing.
-
Apr 1998
Build out additional space within core upgraded-9710045.
-
Jun 1998
Provide mec electrical/hvac/lighting(revise ap#9724354 & 9710045).
-
Sep 1998
To install partitions in existing space/all partitions non-b.
-
Oct 1998
Install ramp for exiting.
-
Dec 1998
Revised fire sprinkler plans permit application 9802393.
-
May 2008
1)convert existing class room into 2 class room by adding new bearing wall. 2) construct new bearing wall to crate new room mfp & sprinkler under seperate permit.
-
Feb 2016
Interior remodel in existing college of the arts building. remodel includes 2-story "classroom pod" with (3) offices on 1st fl & double height space "open studio". relocate existing stair & extend existing interior balcony to access 2nd fl of the classroom pod. replace existing skylight.
-
Jun 2016
No addt'l space conditioning capacity to be installed as part of this permit, install rooftop exhaust fan for open studio 150, install rooftop exhaust fan for vocational classrm studio 240, install rooftop exhaust fan for classroom 140 & 121.install reheat coil complete with ductwork to rms 140 &141.
-
Jul 2016
Install lights, plugs, conduit & cabling; also fire alarm data for 2 new classroom pods & 1 open class room area. ref pa 2016-0203-8656.
-
Jun 2018
To erect 4 stories, no basement, type i-a & v-b, post secondary education.
-
Jun 2020
Test pile program associated with 201806283199, cordon-johnson & assoct will install 4 sacraficial test piles, 4 sacrificial reaction piles & perform load testing in advance of installation of appox production piles.
-
Apr 2022
Interior tenant improvement, non structural, approx. 9200 sq ft.
-
Oct 2022
Auger cast pile.
-
Mar 2023
New nfpa 13 automatic wet fire sprinkler system, 1160 new sprinklers.new nfpa 14 class 1 manual wet standpipe system including combination standpipe, 28 hose valves.new nfpa 20 horizontal splitcase fire pump system including jockey pump, controllers, and test assemblies. reference bpa#2018/0628/3199.
-
Apr 2023
Alteration to existing clerestoru window, replace with temp insul window units. not visible from street.
-
Apr 2024
Installl emergency responder radio coverage system.
-
Jul 2024
Interior ti (n0n-structural) of partial 2nd fl of existing schoool, addition of rooftop mechanical with structural support, no area increase. no change in occupancy.
-
May 2025
2nd/fl: interior tenant improvement of approx. 2004 gsf of the existing use on the second floor, and exterior modifications tot eh roof for the additio of the erv unit to provide make-up air serving the area of the interior renovation.
DBI holds 105 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 105.
The survey dates this building to 1951 in one place and 1946 in another. Not yet documented: the developer, the early tenants and the date of the last recorded sale. The assessor dates the building to 2024; the city's 2011 survey of Showplace Square and the northeast Mission dates it to 1951. Submit an update