2525–2545 16th Street

Mission · San Francisco, CA 94103

  • Built 1924
  • Industrial building
  • 4 stories
  • Zoned PDR1G
  • District 9
  • Historic status: unevaluated
37.7654, −122.4119 Street View appears here once a Google Maps embed key is configured.
41,996 sq ftLot area
12Rooms · 7 baths
  1. 1924

    Built as an industrial building, recorded as occupied by Lyons-Magnus Fruit Products & Flavoring manufacturing.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  2. 1929

    A top floor was added.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  3. Oct 1982

    Building use: sign.

    Complete Permit 8208307 $$$ $400
  4. Aug 1993

    Reroofing.

    Expired Permit 9313138 $$$ $90,000
  5. Dec 2003

    Construct single metal stud wall with gyp bord to provide central corridor.

    Complete Permit 200312021454 $$$ $55,200
  6. Oct 2006

    Construction of new demising walls, partitions, new finishes, new storefront, mechanical & electrical.

    Cancelled Permit 200610195540 $$$ $120,000
  7. Aug 2012

    Construct partition walls within existing space. install sink for office t.i.

    Complete Permit 201208288453 $$$ $42,000
  8. Apr 2015

    Grnd level: new bike storages, conference rms, phone rms, new carpet tiles in conference rms. new appliances in kitchen, new cabinet/counter.remove some lights, add some new lights.add new light covers to existing fluors.. new acoustic panels at some walls.make partial ht conf wall full ht -add 4'of wall.

    Cancelled Permit 201504214174 $$$ $120,000
  9. Apr 2016

    Change of use from pdr to office on 1b, 2/f & 3/f. construction of bicycle storage area to showers & lockers on the 4/f. n/a ordinance #155-13.

    Expired Permit 201604185006 $$$ $100,000
  10. Sep 2018

    3rd floor - interior non structural ti approx 19, 800 sq ft work to include mechanical work and upgrades to accessible bathroom.

    Complete Permit 201809271586 $$$ $200,000
  11. Sep 2020

    Demolition existing mechanical equipment at roof. install new rooftop heat recovery units. install new pge trasformer ventilation system.

    Complete Permit 202009194541 $$$ $300,000
  12. Sep 2020

    Structural work only on "ground floor" for future electrical vault room. install concrete footings & walls between gridlines 1-3 a-d1. installn ew shearwalls between gridlines 1-3 a-d1. no exterior work, all work is on ground fl.

    Complete Permit 202009194542 $$$ $60,000
  13. Dec 2020

    Ti to an existing office building. scope of work consist of new office space including new interconnecting stair. additional scope includes restrooms, kitchen/dining areas, shop facilities, & other office support spaces. minor exterior work includes new storefront entries & infill existing openings.

    Complete Permit 202012211460 $$$ $11,000,000
  14. Feb 2021

    Floors 2, 3, 4: interior demolition of non sturctural, non load bearing walls. no exterior work, . egress components to remain free and clar for operation. fire alarm and fire sprinklers to remain in working order.remain vacancy per ab-017.

    Complete Permit 202102164750 $$$ $80,000
  15. May 2021

    New roof deck addition to an existing building. new structural steel framing & concrete deck. elevator & stair extention including penthouse enclosure & new skylights.

    Complete Permit 202105210824 $$$ $1,000,000
  16. Jun 2021

    A vacant 15, 000 plus or minus space on the 2nd floor is to be built out to a new office space. this permit is for architectural work only. mep, sprinkler, and fire/life safety will be applied later.

    Complete Permit 202106233069 $$$ $500,000
  17. Aug 2021

    2/f: installion of new fan coiles, bathroom, ventilation, outside air venilation and server room space conditional system. ref deferred submittal to permit application 202106233069.

    Complete Permit 202108065978 $$$ $350,000
  18. Aug 2021

    New window on 16th street, 2x new entries on alabama st, 4xnew garage doors, 1x lovered area for mechanical. equipment, accessible lift to alow ada access to space.

    Complete Permit 202108116239 $$$ $175,000
  19. Aug 2021

    Mep work only. install new fan coils, bathroom, exhaust spiral ducting on partial 2nd floor, partial 3rd and all of 4th floor. deffered mep submittal for app#202012211460 for previously approved scope of work.

    Complete Permit 202108166500 $$$ $750,000
  20. Sep 2021

    Existing fire sprinkler system - t.i. 22 added, 72 relocated, & 4 removed sprinlers. 2/f.

    Complete Permit 202109077827 $$$ $50,000
  21. Sep 2021

    Vacant gr floor space to be built out for a tenant. work includes truck bay garage area, work rooms, lab areas, meeting and office areas, storage and new restrooms and showers. mezz area will be be added to space. no work on exterior.

    Complete Permit 202109178700 $$$ $1,400,000
  22. Mar 2022

    Commencement of work not started under previously approved permit application # 201604185006.

    Withdrawn Permit 202203149921 $$$ $100,000
  23. Mar 2022

    Basement: m.e.p. installation of fan coils, outside air ventilation, bathroom ventilation, server room condition system and truck workshop ventilation system.

    Complete Permit 202203240794 $$$ $340,000
  24. Apr 2022

    Rev to permit application 2021-0917-8700: a communicative stair is to be added between two existing floors of previously permitted office space, as well windows will be installed into a 1 hr rated wll between the office space and a garage area.

    Complete Permit 202204202646 $$$ $69,000
  25. May 2022

    1st fl/ mezzanine: tenant improvement. fire alarm: adding fire devices. 11 duct detector. 40 notification.

    Complete Permit 202205184463 $$$ $20,000
  26. Jun 2022

    1st fl: fire sprinkler system for tenant improvement. existing sprinkler system. sprinklers added under mezzenine. wsp heads added to glazing.

    Complete Permit 202206247108 $$$ $48,000
  27. Jun 2026

    1st fl. tenant improvement, constructing 2 rooms with non-struct partitions, new equipment slab to support 3 equipment chamber paints and floor finishes.

    Issued Permit 202606032472 $$$ $322,150

DBI holds 71 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 71. 3 of them are nominal $1 street-space or sidewalk permits.

Not yet documented: the architect and builder and the early tenants. Submit an update