2525–2545 16th Street
Mission · San Francisco, CA 94103
-
1924
Built as an industrial building, recorded as occupied by Lyons-Magnus Fruit Products & Flavoring manufacturing.
-
1929
A top floor was added.
-
Oct 1982
Building use: sign.
-
Aug 1993
Reroofing.
-
Dec 2003
Construct single metal stud wall with gyp bord to provide central corridor.
-
Oct 2006
Construction of new demising walls, partitions, new finishes, new storefront, mechanical & electrical.
-
Aug 2012
Construct partition walls within existing space. install sink for office t.i.
-
Apr 2015
Grnd level: new bike storages, conference rms, phone rms, new carpet tiles in conference rms. new appliances in kitchen, new cabinet/counter.remove some lights, add some new lights.add new light covers to existing fluors.. new acoustic panels at some walls.make partial ht conf wall full ht -add 4'of wall.
-
Apr 2016
Change of use from pdr to office on 1b, 2/f & 3/f. construction of bicycle storage area to showers & lockers on the 4/f. n/a ordinance #155-13.
-
Sep 2018
3rd floor - interior non structural ti approx 19, 800 sq ft work to include mechanical work and upgrades to accessible bathroom.
-
Sep 2020
Demolition existing mechanical equipment at roof. install new rooftop heat recovery units. install new pge trasformer ventilation system.
-
Sep 2020
Structural work only on "ground floor" for future electrical vault room. install concrete footings & walls between gridlines 1-3 a-d1. installn ew shearwalls between gridlines 1-3 a-d1. no exterior work, all work is on ground fl.
-
Dec 2020
Ti to an existing office building. scope of work consist of new office space including new interconnecting stair. additional scope includes restrooms, kitchen/dining areas, shop facilities, & other office support spaces. minor exterior work includes new storefront entries & infill existing openings.
-
Feb 2021
Floors 2, 3, 4: interior demolition of non sturctural, non load bearing walls. no exterior work, . egress components to remain free and clar for operation. fire alarm and fire sprinklers to remain in working order.remain vacancy per ab-017.
-
May 2021
New roof deck addition to an existing building. new structural steel framing & concrete deck. elevator & stair extention including penthouse enclosure & new skylights.
-
Jun 2021
A vacant 15, 000 plus or minus space on the 2nd floor is to be built out to a new office space. this permit is for architectural work only. mep, sprinkler, and fire/life safety will be applied later.
-
Aug 2021
2/f: installion of new fan coiles, bathroom, ventilation, outside air venilation and server room space conditional system. ref deferred submittal to permit application 202106233069.
-
Aug 2021
New window on 16th street, 2x new entries on alabama st, 4xnew garage doors, 1x lovered area for mechanical. equipment, accessible lift to alow ada access to space.
-
Aug 2021
Mep work only. install new fan coils, bathroom, exhaust spiral ducting on partial 2nd floor, partial 3rd and all of 4th floor. deffered mep submittal for app#202012211460 for previously approved scope of work.
-
Sep 2021
Existing fire sprinkler system - t.i. 22 added, 72 relocated, & 4 removed sprinlers. 2/f.
-
Sep 2021
Vacant gr floor space to be built out for a tenant. work includes truck bay garage area, work rooms, lab areas, meeting and office areas, storage and new restrooms and showers. mezz area will be be added to space. no work on exterior.
-
Mar 2022
Commencement of work not started under previously approved permit application # 201604185006.
-
Mar 2022
Basement: m.e.p. installation of fan coils, outside air ventilation, bathroom ventilation, server room condition system and truck workshop ventilation system.
-
Apr 2022
Rev to permit application 2021-0917-8700: a communicative stair is to be added between two existing floors of previously permitted office space, as well windows will be installed into a 1 hr rated wll between the office space and a garage area.
-
May 2022
1st fl/ mezzanine: tenant improvement. fire alarm: adding fire devices. 11 duct detector. 40 notification.
-
Jun 2022
1st fl: fire sprinkler system for tenant improvement. existing sprinkler system. sprinklers added under mezzenine. wsp heads added to glazing.
-
Jun 2026
1st fl. tenant improvement, constructing 2 rooms with non-struct partitions, new equipment slab to support 3 equipment chamber paints and floor finishes.
DBI holds 71 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 71. 3 of them are nominal $1 street-space or sidewalk permits.