375 Alabama Street
Mission · San Francisco, CA 94110
-
1926
Built as the Ames, Harris & Neville factory, four storeys in concrete, designed by Miller & Pflueger.
-
Nov 1981
Additions alterations or repairs.
-
Apr 1982
Building use: coml.
-
Oct 1991
Revise exist. garment into new smaller areas.
-
Apr 1992
Reroofing.
-
Aug 1992
Voluntary partial seismic upgrading of 1st fl windows.
-
Mar 1999
Barrier renew & new low pantitions.
-
Nov 1999
Oti-1 el, me.
-
Jan 2000
Minor 3rd fl improvements.
-
Feb 2000
Install antennas at roof provide equipment rm at roof.
-
Oct 2000
Expansion of existing business service new partition walls and doors new ada restrooms.
-
Jan 2001
Existing tenant is down sizing new walls new bathrooms new corridor 2nd floor.
-
Feb 2001
New partition doors new lights, new sink new power distribution small amount sprklr reworking exit s.
-
Jul 2004
Constructing non structural partitions creating classrooms. providing off street parking for h.c.. s.
-
Nov 2004
Install corridor and handicap bathroom.
-
Dec 2004
Modify existing sprinkler system on 1st & 3rd floor only.
-
Dec 2004
Provide tenant improvement at g/f - providing some non-structural partitions, electrical.
-
Sep 2007
T/i on 1st and 3rd floors. first floor- relocate non-bearing wall to reconfigure parking and create storage. new 1hr. corridor, new lighting. 3rd floor- demolition partitions to create new offices, production and storage. cange from adult education to office/production. mechanical, electrical, sprinklers, l/s under se.
-
Dec 2007
Office tenant improvement for two tenant spaces at the 3rd floor, suites 325 and 350. existing lighting relocated where and as shown on the drawings. hvac under separate permit.
-
Mar 2008
Revision to appl #200712211106 - 3rd floor -1) add two showers, one to be da accesssible, 2) add 2 conference rooms and one work room, 3) add low walls & open office, 4) minor revisions to partition schedule, 5) add skylight note at suite, 6) add notes. plumbing & mechanical under separate permit.
-
Sep 2008
Reroofing.
-
Oct 2009
Reroofing.
-
Mar 2015
Verizon wirelesss equipment platform on rooftop, equipment cabinets, twelve (12) panel antennas on roof behind frp screening. install a meter (200 amp). & a generator receptacle. ** maher: compliance with ordinance no# 155-13 not required **.
-
Dec 2021
Verizon: remove and replace 6 existing antennas with 6 new antennas. remove and replace 3 existing rrus-32 b2 units with 3 new radio 8843 units at antennas. install 3 new radio 8863 units at antennas.
-
Feb 2023
To comply with nov 202200179: interior renovation at ground floor lobby. work to include expansion of existing lobby to enlarge tenant mailing area & provide new secure package room.
DBI holds 82 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 82. 5 of them are nominal $1 street-space or sidewalk permits.
The statement's narrative dates the factory to 1926 in one passage and 1927 in another. Not yet documented: the developer and the early tenants. Submit an update