Permit history
-
Dec 1995
Rmdlexistingbakery to a rest with open cooking area (small self serv.
-
Apr 1997
Renew permit application 9520841.
-
Apr 2002
Install 2 new canvas awning over storefront (see plans).
-
Dec 2002
Add new fire protection for the residential hotel.
-
Feb 2003
For as built drawing per app #200212022602.
-
Nov 2003
To renew app#2002/12/02/2602 & 2003/02/21/7995 for final inspection.
-
May 2006
Replace the electric heaters room #1, 4, 5, 6, 7, 8, 11, 12, 13, 14, 15, 16, 17, and 18 at 2nd & 3rd floors.
-
Sep 2007
Change to lighting in dining room, add 3 comp. sink and floor sink in bar area of existing restaurant. new booth seating change of ownership.
-
Jul 2011
Comply with nov#200994080 to legalize exhaust hood & duct installation (mechanical work only).
-
Jul 2011
Remove commercial kitchen hood per nov# 200994080, install without benefit of permit, hood to be removal & wall to be repaired.
-
Aug 2011
To obtain final inspection for work approved under permit application 200709243473 all work is complete.
-
Aug 2011
To comply with nov #2009-94080- remove commercial kitchen hood, installed without the benefit of permit, hood to be removed & wall to be repaired.
-
Oct 2011
Installing, sheathing and tiles on floor and replacing plumbing and electrical fixtures in six units.
-
Oct 2011
Replacing tiles & plumbing fixtures for 2 showers & 2 toilets on 2/f. 2 showers & 2 toilets on 3/f. no change on walls and opening. no window & no door work on this permit.
-
Sep 2012
Remodel ground floor unit existing kitchen & bath in kind. all new fluorescent lighting throughout.
-
Jun 2013
To comply with ordinance 029-13 only, installation of grab bars in sro, 4 showers, 4 toilets, grab bar min. 250 lbs load.
-
Jun 2014
Soft story retrofit (structural upgrade) - install new shearwall & new moment frame to comply with ordinance per sfbc chapter 34b. 2012 iebc appendix a-4.
-
Jun 2014
T.i. of full service restaurant, work includes removal interior door & partitions, counter and food service equipment, install of door in opening, interior door, interior partitions, food service equipment, fixtures, furnishing, equipment. mep separate permit.
-
Jun 2014
Mep only. reference pa 2014/0613/8381, minor lighting installation and vent in restroom.
-
Sep 2014
Install new retactable awnings with no signage & install new fabric on 3 existing awnings.
-
Feb 2018
Reroofing.
-
Aug 2024
Interior remodel of 1st floor restaurant. scope includes front and back of house spaces. new flushes, fixtures and electrical. no structural work.
-
Oct 2024
Low frequency devices is being installed along existing fire alarm panel and existing notification devices in complience with sffd 1103.7.6.1.
-
Jan 2025
Revision to 202410032288. reflecting the center hallway corridors on 2nd and 3rd fl with fire escape/emergency exit at the end of the corridor. reflect 2 pull statiions on each floor.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update