108–118 Albion Street
Mission · San Francisco, CA 94110
Permit history
-
Jun 2026
Securty bars will be added to exterior of front windows 2 total at ground fl unit (108a & 108b).
-
Jun 2026
Revision 202606123109-railing & gates will be installed to the front of 2 ground fl units (108a & 108b) flanking the e) railing & gate at the mian entrance.
-
Oct 2025
Install new sprinkler monitoring system, ref to adu permit application 202012070397 & sprinkler 202503313352.
-
Mar 2025
New fire spinkler system and underground for 2 adu at the ground fl per nfpa 13 ref permit application 2020-1207-0397.
-
May 2022
Rev to pa202107134234: relocate plywood shearwall from rear exterior wall to kitchen/living room wall. replace 7 existing windows in one unit. almunimum clad wood.
-
Apr 2022
Replacing exterior door on back of one unit. in-kind.
-
Mar 2022
Replacing 2 windows facing to the street. double hung wood windows with integrated ogee locks above front entry. replace in existing openings.
-
Aug 2021
Replacing 30 windows for 4 units. new windows are same size of old ones. no facing the street.
-
Jul 2021
Interior remodel of 4 existing 2 bedroom residential units: 108, 112, 116, 118. kitchen and bath remodel new closets, laundry room.
-
Dec 2020
(2) ground floor accessory dwelling units per ordinace 162-16. units to be located in existing garage & storage space. ref permit application 2016/0428/5904 for soft story retrofit. infill (2) garage doors and add (3) wood windows & (1) entry doors at front facade. no expansion of building envelope.
-
Oct 2020
Rev to pa201604285904, change structural engineer, rev per existing structural conditions.modifty steel moment frames at front and relocate ply shearwall foundation. change underpinning foundation to new foundation.
-
Aug 2019
Commencement of work not started under previously approved permit 201604285904 (soft story retrofit per sfbc chapter 34b engineering criteria per asce 41-13 includes plywood shear walls, simpson strong walls and strong frame, and grade beams.).
-
Nov 2018
One unit: to comply to nov #201882781, item #6: replace 1 door at rear top floor (one unit). no change to door opening.
-
Aug 2018
To comply with nov#201875481 item #3 at rear exit path repair ceiling with fire resistant materials.
-
Jul 2018
For stair inspection per nov#201873001 item #2 section 604 minor stair repair less than 20% at rear stairs.
-
Apr 2018
Commencement of work not started under previously approved permit application # 201604285904.
-
May 2016
Add 2 dwelling nits per ord 30-15 with a manatory seismic retrofit app #201604285904 at g/f. project includes new lobby serving only new dwelling units at ground floor.
-
Apr 2016
Soft story retrofit per sfbc chapter 34b engineering criteria per asce 41-13 includes plywood shear walls, simpson strong walls and strong frame, and grade beams.
-
Oct 2014
Work in one unit: interior renovation of existing 2 bedroom apt one unit of 3 story with basement building. no change to envelope. occupant load, gross area, mechanical system.
-
May 2014
One unit - remove non-bearing interior walls, new & infill non-bearing interior walls, remodel kitchen & bath. relocate existing bedroom to living room, new washer/dryer, lighting to modified areas.
-
May 2014
Repair dry rot damage at rear stair and porch area less thant 50% use exterior grade p.t. and rewood primed.
-
Sep 2009
Remove wood utility ladder to roof per nov.
-
Mar 2004
Reroofing.
3 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.