299 Dolores Street
Mission · San Francisco, CA 94103
-
1911
Virginia Fair Vanderbilt gave the Sisters of the Holy Family the money to build a children's day home at the corner of Dolores and 16th Streets; Willis Polk designed the Italianate building.
-
May 1982
Building use: pre-school.
-
Aug 1982
Building use: day care.
-
Aug 1983
New construction wood frame.
-
Dec 1983
To construct phase ii of the holy family day home.
-
Aug 1986
New cabinet, replacement of light fixtures and sinks.
-
Feb 1987
Install additional "exits" doors in classrooms #3 & #4.
-
Sep 1989
New aprtitions for private offices, new suspended ceilings.
-
Apr 1990
Provide temporary protective barrier.
-
Jun 1990
Horizontal addition.
-
Oct 2000
Street space.
-
Feb 2001
Install a security cyclone fence around perimeter of existing vacant lot-fence to be 8 ft in height.
-
May 2001
Disabled ramp and stair with deck to serve mobile trailer, seismic anchors for trailer.
-
May 2002
Erect a two story child care center.
-
Jun 2002
Street space.
-
Oct 2004
Erect a 2 story children's day care building.
-
Apr 2005
Erect one 3-story type v building.
-
Dec 2005
Install new overhead fire sprinkler systm/entire building per nfpa 13/using existing service.
-
Aug 2006
1st, 2nd, 3rd floor only: install new fire alarm devices & heat detectors.
-
Oct 2006
Revised drawings 200608109198, add 1 smoke detector.
-
Mar 2009
Renew permit application 2005/12/05/9484 to obtain final inspection. all work has been completed.
-
Jul 2011
Upgrade to ul-300 fire system in the kitchen hood, hood & duct system.
-
Jan 2012
Minor alterations to existing restrooms, replacement of plumbing fixtures, replacement of lighting with new, minor electrical associated with lighting, new tool shed premanufactured.
-
Feb 2012
Alterations to e restrooms to convert to offices. replacement of lighting with new, minor electrical related to lighting.
-
Dec 2016
Emergency fire alarm panel replacement, provide new edwards io500 panel, reuse all existing devices.
DBI holds 33 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 33. 6 of them are nominal $1 street-space or sidewalk permits.