2032–2034 Mission Street
Mission · San Francisco, CA 94110
Permit history
-
Apr 1984
Sprinkler system.
-
May 1984
Repair back stairs on west side the building & south side.
-
Mar 1986
To bring into code.
-
Mar 1987
To convert house keeping rooms back to individual.
-
Dec 1991
Repair of fire damage.
-
Jan 1992
Sheetrock four rooms, paint, carpeting, and repair.
-
Apr 1992
Replace of dadding & carpet in hallways room, plaster, patch.
-
Jul 1993
Proposed remodel store front at existing donut shop.
-
Feb 1994
Install 75, 000 btu forced air heating systems. replace existing.
-
Jul 1994
Replace of floor and wall tiles.
-
Nov 1996
Repair replace of 50 windows at sides of building.
-
Jul 2003
Add (2) sprinkler heads in hallway to correct violation, replace painted sprklr heads.
-
Jul 2010
Upgrade to ul 300 ( ansul system) to existing " western donut chinese food restaurant ".
-
Dec 2010
Fire supression: revision to 201007146585.upgrade to ul 300. add griddle to fire suppression plan.
-
May 2013
To comply with ordinance 029-13 only. installation of grab bars in sro at the following locations: 2 bathrooms on 2nd floor, 2 showers on 2nd floor, 3rd floor 2 bathrooms, 2 showers on 3rd floor.
-
Feb 2017
To correct complaint #201643881 and 201566718. remove/replace deteriorated guard rails, handrails, thread, landing. weather proof siding, privide exit sign. install bitumen, backerboard, and tile over stairs and landing. all work is at back of building exterior stairs, landing, & assoc. landing/railing.
-
Mar 2017
Seismic retrofit of soft story comply with sfbc 4d mandatory seismic retrofit per 2012 iebc appendix a4 (commercial only).
-
Mar 2017
Seismic retrofit of soft story comply with sfbc 4d mandatory seismic retrofit per 2012 iebc appendix a4 (residential only).
-
Nov 2017
Install low frequency horns in the sleeping rooms to comply with sffd section 1103.7.6.1.
-
Feb 2019
Residential: mandatory soft-story seismic retroifit per sfbc 2016 ordinance 66-13. 2016 cebc appendix a-4.
-
Feb 2019
Commercial: mandatory soft-story seismic retroifit per sfbc 2016 ordinance 66-13. 2016 cebc appendix a-4.
-
Sep 2021
Comply with nov #202181454: adding bathroom fan, relocating water heaters connect to flue run, correction to the rear stairs reinforcement, repair/replace windows.
-
May 2022
Comply with complaint # 202290593 replaced water heater with tankless. run new flue in basement (per manufacturers install instructions), add dedicated electrical to tankless, add sump pump in basement.
-
Jul 2022
Administrative permit to establish the limited restaurant to restaurant land use change. no work perform. remaining b occupancy.
DBI holds 28 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 28. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update