101 Utah Street
Mission · San Francisco, CA 94103
-
1957
Built as a commercial building, recorded as occupied by San Francisco Jewelry Center.
-
Oct 1981
Additions alterations or repairs.
-
Jan 1982
Additions alterations or repairs.
-
Aug 1982
Building use: warehouse.
-
Oct 1982
Additions alterations or repairs.
-
Oct 1982
Additions alterations or repairs.
-
Jan 1983
Additions alterations or repairs.
-
Mar 1984
Demolition of non-structural extensive remodel.
-
Apr 1984
Additions alterations or repairs.
-
May 1984
Tenant improvements.
-
Nov 1984
Construct two story restaurant in existing tower structure.
-
May 1985
Install stairway to third fl, two hr separation, fire escape.
-
Jul 1986
Construction of non-bearing partitions.
-
Nov 1987
Vertical addition.
-
Sep 1989
Reroofing.
-
Aug 1993
Remove existing entrance door to showroom, remove finishes.
-
Feb 1994
Retile replace fixtures and partitions.
-
May 2001
Reroofing.
-
Mar 2005
Supply & install steel support frames to accomodate existing hvac equipment.
-
Feb 2019
Ref sprinkler permit application 201901311732; demolition of non structural partitions on 1st, 2nd & 3rd floors; ab-017.
-
Mar 2019
Install a 10' high security fence around the entrance to the building.
-
May 2019
Ada upgrade entrance / rrs / parking / ramp. ti include structural seismic upgrade in conformances with attached pre application letter. alterations include modifying exterior wall openings, add skylights & floor openings. new non structural partitions. mep & fire life safety under separate permit.
-
Jun 2022
Provide new fire alarm system and a new elevator landing emergency 2-way communication system for core and shell. ref bpa 201905312103.
-
Oct 2022
Converting existing planning use of wholesale showroom to proposed use of laboratory.bike parking, restrooms, showers & lockers, non-load bearing partitions, floor wall/ceiling finishes.scope of work on this permit includes architectural scope only.mep deferred.
-
Jun 2026
Removal of 8358 sq ft on 2nd floor, relocation of brace frames. no change of use, interior work only.
DBI holds 76 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 76.
Not yet documented: the architect and builder and the early tenants. Submit an update