1906
Built as a commercial building, associated with R. N. Nason & Co. paint factory. Built by Kiel & Dye. The survey cites building permit no. 686, dated 14 June 1906.
-
1917
Built as an industrial building, associated with R. N. Nason & Co. paint factory. Designed by Emile S. Semme (north portion) and Theodore Lenzen (south portion).
-
1929
Built as an industrial building, recorded as occupied by R. N. Nason & Co.
-
Nov 1984
Replace brich along steel beam & header ovel window.
-
Dec 1988
Build a metal room in warehouse for paint mixing.
-
Jan 1990
Fire sprinklers for spray booth and mezzanine.
-
Oct 1992
Parapet.
-
Oct 2000
Replace currect sign with painted or self adhesive vinyl advertising exhibits a & b.
-
Feb 2003
Submittal to clear umb building ord for umb section with seismic upgrade (umb retrofit).
-
Feb 2003
Reroofing.
-
Feb 2014
Construct new 5' wide mezzanine for artists and upgrade electrical and introdue heating into spaces. upgrade ada compliance with new front entry door, ada closing hardware and push button at exterior. n/a for maher ordinance ~kf21&~kf21&-133.
-
Mar 2014
Add (14) sprinklers to existing sprinkler system. ref app#201402067956.
-
Jan 2019
Change of use. change to arts activities, retail sales and services accessory use for gallery ar sales 576 sq ft and community facility private.
-
Sep 2020
New dedicated function sprinker monitoring system. sprinkler permit application 201403281971.
-
Oct 2020
Demolition of portion of non-historic loading dock in building b ( 199 potrero / 648 15th st ). installation of a pge transformer on a concrete pad. electrical drawings showing the bus duct and electrical room layout shall follow as a separate submittal.
-
Nov 2020
Renovation & expansion of existing building 2 (identified on plans as area c, e & lobb) on parcel 004.
-
Nov 2020
Renovation & expansion of existing building 1 (identified as area a and b) on parcel 004.
-
Nov 2020
Demolition of structure (area b - 199 potrero st/648 15th st) to accomodate expansion of adjacent area a (151 portero ave).
-
Nov 2020
Building 1: interior structural strengthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert existing freight elevator in area e into a passenger elevator.
-
Nov 2021
Demolition of a portion of a non-historic loading dock in building b (199 potrero/648 15th st). install pg&e transform on concrete pad. elecrical drawings showing the bus duct & electrical room layout shall follow as separate submittal.
-
Jan 2022
Concrete chipping for scanning of existing columns and beams. removal of non-structural masonry to expose concrete for material scanning. no structural work.
-
Sep 2022
Building 2, interior structural strenthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert existing freight elevator in area e to passenger elevator. application travel with permit application: 202011189185.
-
Sep 2022
Patrial demolition of a one story plus mezzanine wood framed structure known as area b (199 potrero av) including roof, walls & supporting foundations. site preparation for expansion of existing adjacent area a (151 potrero) and a new accessible entrance in area a.
-
Dec 2022
Deferred submittal for fiber reinforced polymer (frp) as shown on the approved seismic strengthening drawings (bpa# 202209092150).
-
Dec 2022
Temporary shoring along perimeter for new development.
-
Aug 2023
Revision to bpa#202209092150 for modifications to concrete drag beams.
-
Oct 2023
Revision for electrical review missed under permit application 202011048189 & 202011048183.
DBI holds 28 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 28. 3 of them are nominal $1 street-space or sidewalk permits.
The survey's data table dates the building to 1914; the context statement's appendix dates it to Ca. 1915. The survey's data table dates the building to 1906; the context statement's appendix dates it to Ca. 1915. The survey's data table dates the building to 1917; the context statement's appendix dates it to Ca. 1915. The survey's data table dates the building to 1929; the context statement's appendix dates it to Ca. 1915. Not yet documented: the developer and the early tenants. Submit an update