111–133 Powell Street
Nob Hill · San Francisco, CA 94102
Permit history
-
Jan 1984
Complete awning steel tubing frame fabric cover work.
-
Apr 1984
Additions alterations or repairs.
-
Jul 1986
Storefront alterations; relocate entry.
-
Oct 1994
Reroofing.
-
Jun 1995
Seismic retro fitting umb.
-
Apr 1996
Reroofing.
-
Feb 1998
Renovation, restoration, mechanical electrical/struct upgrde.
-
Feb 1998
Skylight g/f storefront & 2nd floor facade restoration.
-
Jan 2000
One stop- renewal to application 9916490.
-
Feb 2000
Fire sprinklers per app #9918873.
-
Apr 2004
New fire alarm system.
-
Apr 2012
Exterior facade alterations for new retail store. signage submitted under separate permit. core + shell, and t.i permits to be submitted under separate permit.
-
Apr 2012
T.i. for new retail store. work includes new partitions, fixtures, finishes, millwork. mep under separate permit. core & shell under separate permit application 2012/04/17/8512. exterior facade work under separate permit application 2012/04/10/8034. no exterior work under this permit. fire protection under separate permit.
-
Apr 2012
Structural demolition & new constuction for core & shell in advance of t.i. work includes new mezzanine, bathrooms, stairs, skylight. new structural columns & beams.
-
May 2012
M.e.p. work only for t.i. of new retail store under 2012-04-17-8515. fire protection under separate permit.
-
May 2012
Remove existing mezzanine and construct a new mazzanine. install new restrooms at basement level.
-
Jun 2012
Ground floor to 2nd floor-demolition floor openings & install new stairs at ground & 2nd floors in advance of tenant improvement. new mezzanine was approved under permit application 2012-0530-1485.
-
Jun 2012
Phase iii of structural work, including new columns & beams new roof membrane new chase in building. corner new insulated walls inside brick walls new floor infill where escalators are removed. previsouly approved permit permit application 201206051902 & 201205301485.
-
Jul 2012
Addition of a fire alarm system for the building.
-
Aug 2012
Tenant improvements: existing fire sprinkler system up grading of system- bsmt 99 sprinklers 1st 22 sprinklers mezzantine 36 sprinklers 2nd 46 sprinklers.
-
Jun 2017
Remove, relocate cashwrap fixtures o n 2nd floor; remove glass display case (basement) (add floor fixtures; new wall on the 2nd floor for shelving units, ceiling patch repair (interior only).
-
Jan 2018
Interior t.i. basement, ground floor and 2nd floor. remove, replace fixtures, flooring, glass fixtures ada compliant. no structural.
-
Apr 2019
All interior remodel of mezzanine, removal of floor fixtures/installation of new furred wall with signs on new wall new suspended sign, new display cases, new power for neon sign transformers. sign under separate permit.
-
Sep 2022
Temporary retail pop up store inside existing vacant retail store. temporary wall panels supported by structural engineer design. temporary flooring @ entry area, existing flooring to remain. temporary power for monitors and displays. pop up to open 10/7/22 to 10/28/22 then.
-
Jan 2023
Temporary retail pop up store inside existing vacant retail store. temporary wall panels supported by structural engineer design. temporary flooring at entry area, existing flooring to remain. temp power for monitors and displays. pop up to open 1/25/2023 and run through 2/28/2023 then close and strike.
DBI holds 64 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 64. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update