119–139 Ellis Street
Tenderloin · San Francisco, CA 94102
-
1907
Built.
-
August 21, 1964
Photographed, showing the Gilded Cage bar.
-
March 1966
The Redevelopment Agency photographed the property, then the Continental Hotel.
-
Jul 1981
Additions alterations or repairs.
-
Oct 1981
Additions alterations or repairs.
-
Jan 1985
To remove existing store front glass and replace with new.
-
Aug 1985
Repair fire damage.
-
Mar 1987
Renew mechanical & electrical systems.
-
Apr 1987
Combine certain tourist rooms to make new guest rooms.
-
Jun 1987
Modify and provide fire sprinkler system.
-
Jun 1987
Redecorate hotel lobby & restaurant area, non structural.
-
Aug 1987
Install 2 type i grease flues & make up air system.
-
Oct 1987
Install fire sprklr system.
-
Dec 1994
Demolition of interior-constr div mwall-apply floor tile & wallk cov.
-
May 2000
Shelter being set on the roof with antennas on shelter electrical & tele conditions on rear extension.
-
May 2000
Street space use.
-
Nov 2000
Install 2 18 inch omni whip antenna on exterior & associated equipment with in existing storage area in base.
-
Mar 2004
Replace existing non-working fire sprinkler monitoring system for entire building.
-
Nov 2005
Tenant improvement new partitions, ceiling, entry doors, new accessible toilet room, finishes millwork.
-
Aug 2007
Seismic upgrade to un-reinforced masonry building.
-
Sep 2007
Remodel first floor lobby and guest rooms on all floors; remodel first floor store front and existing marquee; enclose fire stair 4th floor to ground; mechanical. electrical and plumbing under separate permit.
-
Mar 2008
Relocate and add sprinkler heads on floors 2, 3, 4, 5 and basement and 1st floor for a total of 422 heads. ti under permit application 2007.10.18.5809.
-
Apr 2008
Work only on #127 ellis st.1st floor-add & relocate pendent sprinklers, basement-change sidewall sprinkler, women restroom, new double detector check valve assembly, add sprinkler to top & bottom elevator shaft, replace any painted or damaged sprinkler heads. in basement new heads-22 total.
-
May 2008
Basement thur 5th floors-basement: add smoke detector to elevator machine room, add horn/strobes to common area. 1st floor: remove beam detector, add common area smoke detection, 2nd -5th floor: upgrade to ada rooms, s/d horn/strobes, add horn/strobe to restrooms.
-
Jun 2008
Revision to appv'd permit application 2007-0911-2357. guestroom bathroom venting shafts on all floops and units.
-
Apr 2018
Interior non structural-merging two resturants into one b occupancy- new hood and kitchen exhaust system. ul 300 system separate permit.
-
Mar 2020
Construction of a sub-slab depressurization system in basement to treat voc impacted vapors in soil. includes civil, structural, plumbing and electrical, work not visible from the street.
DBI holds 85 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 85. 4 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 24–34 Ellis Street Same street
- 140 Ellis Street Same street
- 45–49 Powell Street Same block
- 57–71 Powell Street Same block
- 17–33 Powell Street Same block
- 101 Powell Street Around the corner
- 111–133 Powell Street Around the corner
- 135–149 Powell Street Around the corner