2262–2266 California Street
Pacific Heights · San Francisco, CA 94115
-
1904
Congregation Sherith Israel moved from Post and Taylor streets into a new building here in 1904: a grand neoclassical design with a large central dome by the Beaux-Arts-trained architect Albert Pissis, whose other work includes the Hibernia Bank and the Flood Building. Its sanctuary holds a stained-glass window showing Moses carrying the Ten Commandments from El Capitan into Yosemite Valley.
-
1906
One of the few large buildings left standing after the earthquake and fires of 1906, it served as the city's Hall of Justice while the Civic Center was rebuilt.
-
Jun 1984
School improvement-remove non-bearing/paint walls.
-
Apr 1987
Reroofing and repair to existing structure.
-
Jun 1987
Selective demolition of exterior.
-
Apr 1988
Parapet strengthening.
-
Nov 1992
Install ansul hood & duct fire suppression system.
-
May 1995
Replace type i range hood, replace exh blower, add air fan.
-
Jun 1995
Repipe exist ansul hood/duct fire system to protect new stov.
-
Sep 1996
Horizontal addition.
-
Apr 1997
Modification of existing fire sprinkler.
-
Aug 1997
Fire alarm.
-
Aug 1997
Fire sprinkler revise plans app #9706170 remove bfp.
-
Aug 1997
Revision to permit application 9617002/delete 1hr rating for exter.pedest.
-
Aug 1997
Install fire system into the existing hood & duct.
-
Jan 2005
Streetspace.
-
Jan 2007
Project provides seismic strengthening. roof access stair will be modified to accommodate revisions to roof diaphragm. project also includes new roofing & exterior repairs to facade. improvements to disabled access include provision for accessible seating at main floor and balcony.
-
Apr 2016
Revision to permit application 200701302909 - revised accessible path of travel to provide ramp @ hallway & change use from chapel to multipurpose room.
-
May 2016
Revision to north reaction wall, piers foundations to permit application 200701302909.
-
Sep 2016
Revision to permit application 200701302909 sheet a701; to provide structural design for spiral steel stairing in northeast stairwell of building.
-
Dec 2016
Replace existing flexible ductwork with new 26 gauge steel ductwork in crawl space in conjunction with replacement of 3 existing forced air furnaces with new.
-
Jan 2017
Reroofing.
-
Dec 2017
Replace existing temporary shoring with permanent steel shoring epr designs & plans as drawn & calculated by structural engineer.
22 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update