Permit history
-
Dec 1992
Parapet bracing.
-
Jun 1993
Remove some of front glass to install entry doors.
-
Jun 1993
Supply & install new dry stand pipe to replace existing one.
-
Jul 1993
Remove mis n/b partition walls clean up of space.
-
May 1995
Comply with umb ordinances.
-
Jan 1996
Electrical lightening.
-
Jun 1998
Installation.of fire alarm system.
-
Mar 1999
Fire alarm with in space on 4th floor.
-
Aug 2000
Demolition exist. walls, new walls, paint, carpet, handicpa rail at entry, etc.
-
Dec 2003
Voluntary upgrade of restrooms to handicapped accessible, removal of plumb fix, stall partitions, ne.
-
Apr 2004
Restroom upgrade on 4th fl, relocation of sinks, toilets & partitions, replace lighting.
-
Dec 2004
Oti-1, 2nd fl, el, me, ls, sp.
-
Dec 2004
Fire alarm system addition 2nd floor office area.
-
Dec 2004
Voluntary upgrade to existing restrooms to make them accessible compliant - barrier removal.
-
Feb 2005
Ground floor-lobby upgrade front door, new restrm 35k, new storage $200. new accessible entrance 5k.
-
Dec 2005
Oti-1 1st floor/tenant improvements/walls, doors, ceilings and finishes.
-
Dec 2005
Wood infill floor at g/f.structural work only.architectural work for this infill under building. appl#200512019296.
-
May 2006
Enclose existing alcove of 56 sq ft. off of lobby to become an equipment room.
-
Jun 2006
Erect: non electric, single faced, non illuminaged replacement sign with street space.
-
Mar 2009
Voluntary structural upgrade with new steel connectors at beam to column intersections of heavy timber members. new concrete frame at entry to building. replacement of existing storefront. minor ada upgrades. no plmg or mechanical work. minor replacement of electrical lghtg (exterior.).
-
Jun 2010
Replacement of existing constant volume a/c system with new roof top packaged vav system. supporting structural and electrical. work. addition of vav boxes and modification of existing ductwork.
-
Jul 2010
Interior mechanical work only. rooftop unit under sep permit 201006033754.
-
Dec 2021
1st floor - install new control panel to replace failing existing panel. replace existing annunciator. new wireless communicator and monitoring module. system monitoring by ul listed central station.
-
Jun 2026
Commercial ti: new cafe at existing ground floor commercial space. new finishes and equipment. no structural work, no mechanical work, new plumbing work. new electrical work (power only, no lighting work).
DBI holds 31 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 31. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update