May 1987
Renovate building. update mechanical, electrical, instal elevator.
-
May 1987
Interior demolition.
-
Sep 1988
Tenant imp. 3rd fl.
-
Jun 1989
Gyp. bd. walls, aprtitions, new plugs.
-
Jun 1998
Provide t/i per plans install wall doors and walls wrk statn.
-
Jul 1998
Install unoccupied cellular equipment room in basement with tel.
-
Nov 1998
Telecom switch unmanned/fleet/hvac/plumbing/arch.
-
May 1999
Mmi ground floor, el & me.
-
Jun 1999
Interior remodel install wall door per plans.
-
Sep 1999
Change storage to office const. new bathrms stair to mezz.
-
Apr 2000
New walls new doorsdemo of existing walls no struct add restrms new lighting new hvac.
-
Jun 2003
Oti 1-5th floor, ltg, mechanical, l/s, spr.
-
Nov 2003
#420- single t.i. to existing 4/fl office space. install new non-bearing partitions, provide new separate.
-
May 2014
Replacement of ground floor window sash along 3rd st elevation. replace 2 entry doors. ** maher: compliance with ordinance no# 155-13 not required **.
-
Aug 2014
3rd floor: interior tenant improvements, ste 320, including ada bathroom upgrades, interior wall additions, and cleaned up interior finishes. maher n/a.
-
Apr 2015
3rd floor sutie #333: interior t.i. includes interior walls additions and demolition/clean up interior finishes as required. mep under separate permit. no change of use. not visisble from street. maher n/a.
-
Feb 2016
2nd fl tenant improvement, new ada restrooms, office/phone rooms. minor improvements to 3rd fl including ada shower.
-
Mar 2016
2nd floor ti including new connecting stair to 3rd floor.
-
Oct 2018
Inter ti improvement of partial existing 3rd floor.
-
Nov 2018
Electrical title 24, lighting.
-
Jan 2019
2nd fl - interior tenanat improvement of partial floor.
-
Sep 2020
Voluntary notification upgrade to existing building fire alarm system. add (7) power supplies, (6) smoke detectors, (103) strobes only, (197) horn/strobes.
-
Mar 2021
Decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project.
-
Jun 2022
Complete suite vacation of an existing telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switches, a.c. units systems, etc.. the end state of the vacated suite shall be a white shell configuration.