620–630 Third Street
South Of Market · San Francisco, CA 94107
Permit history
-
Sep 1986
Replace wood window with aluminum store front section.
-
Mar 1993
Reroofing.
-
Sep 1996
Removal & relocation of non bearing walls.
-
May 1998
Oti-2 1/f el me.
-
May 1998
Oti-1 g/f el me ls sp.
-
Jul 1998
Design, install, test fm 200 fire suppression system.
-
Jul 1998
Replace existing toilets with new men's/women's access toilets.
-
Jul 1998
Oti-2 1st floor sp.
-
May 1999
Expand fm200 fire suppression system.
-
Nov 1999
Oti 1 2nd floor, el, me, sp & ls.
-
Jan 2000
Oti-3 2nd floor sp.
-
Mar 2000
Install new fm200/pre-action system on 2nd floor for verio snites.
-
Apr 2005
Relocate 2 crac units and associated condensing units on roof mokify existing duct work to accomodate.
-
Feb 2008
Ti for 1st floor. demolition non- structural partition for offices, electrical and lighting to accomondate new construction. lfe safety, mep and sprinkler plans to be submitted under a separate permit.
-
Jul 2008
2nd floor -creating new non-bearing partition walls for electrical room. providing new generator and fuel tank above roof structure including new transformer on site.
-
Oct 2008
Installation of fuel supply system consisting of management panel, alarm panel pumps and valves for one 660 gallon above ground supply tank & 1 660 gallon day tank on roof serving 1500 kw power generator installed by others. ref. appl. 200807086131.
-
Feb 2009
Creating new non bearing partition walls for man trap. providing new door and hardware with card reader with bio metric access entry.
-
Jul 2009
Accomodate existing 2nd fl vacant area with raised floor and prepare for future use. remove existing non-structural interior way. provide electrical, lighting and ac. install new generatior on existing platform on roof.
-
Aug 2009
Add bell, horn strobes, strobes, modules, smoke detectors & duct detectors to existing cheetah control panel in 2nd. floor lease area. that controls single interlock preaction systems.
-
Jun 2010
Heating and air condition installation - 1st floor (mechanical only).
-
Oct 2011
Ti on the 1st fl, incl. removal of non-struc partitions and raised fl. construct new drywall partitions, raised floor, electrical, lighting, hvac at roof. install fuel storage.
-
Nov 2011
Interior non structural demolition-ab-017.
-
Feb 2012
Provide new fire alarm/pre-action detection & controls for the 1st floor & monitoring of existing fire protection on 2nd floor.
-
Mar 2012
Fire sprinkler system upgrade. relocate 41 upright sprinkler heads o the gr floor. relocate 28 pendent sprinklers and 25 pendant sprinklers. update eq bracing.
-
Mar 2012
Install a fuel oil system with a leak detection & level monitor panel, remote fill port & piping to a 1, 320 gal ul 2085 storage tank located on level i.a submersible pump set deliver diesel fuel thru dble contained piping to a 660 gal ul142 day tank located on roof serves 2000 kw emer generator.
DBI holds 51 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 51. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update