144 Townsend Street

South Beach · San Francisco, CA 94107

  • Built 1922
  • Office building
  • 3 stories
  • Zoned SSO
  • District 6
  • Historic status: historic resource
37.7802, −122.3920 Street View appears here once a Google Maps embed key is configured.
45,000 sq ftBuilding area
16,496 sq ftLot area

Permit history

  1. Jul 1982

    Building use: ware/office.

    Complete Permit 8205536 $$$ $52,000
  2. Mar 1993

    Install a fire sprinkler system to protect entire building.

    Complete Permit 9303733 $$$ $42,870
  3. Aug 1993

    New self storage units.

    Complete Permit 9313167 $$$ $50,000
  4. Aug 1993

    New self storage units.

    Complete Permit 9313165 $$$ $50,000
  5. Aug 1993

    New self storage unit.

    Complete Permit 9313166 $$$ $50,000
  6. Aug 2000

    Int remodel of ex building convert ex slf strge to off/business svc uses with parkng on gr floor.

    Filed Permit 200008097468 $$$ $500,000
  7. Feb 2015

    Remove existing walls, doors, & finishes. construct new walls, doors, ada lift, ada restrooms, ada parking, and bike storage; maher n/a. mep is to be design build and deferred. stair, bollards and guardrail connections deferred submittals.

    Complete Permit 201502117996 $$$ $96,000
  8. Mar 2015

    All works at 2nd floor. consists of minor demolition and construction. remove existing walls, doors, fixtures and finish. construct new walls, doors, lighting and ada restroom. occupancy not to change. n/a ordinance #155-13.

    Complete Permit 201503050095 $$$ $60,000
  9. Mar 2015

    2 ada restrooms and storage rooms. all work at 3rd floor. n/a for the maher. mep, sprinkler & life safety under separate permit.

    Complete Permit 201503201524 $$$ $40,000
  10. Apr 2015

    All work is on the 1st fl and consist of minor demolition and construction as follows. new walls, doors, sidelights, power, lighting, finishes, ada restrooms and shower. n/a ordinance #155-13.

    Complete Permit 201504022684 $$$ $250,000
  11. May 2015

    Reroofing.

    Complete Permit 201505287375 $$$ $68,000
  12. Jun 2015

    Electrical work per plan. ref app#201503201524. n/a for the maher.

    Complete Permit 201506159035 $$$ $8,000
  13. Jun 2015

    Mechanical work per plan for 3rd floor only. t.i. permit application 201503201524. n/a ordinance #155-13.

    Complete Permit 201506169132 $$$ $8,000
  14. Jun 2015

    2/f - t.i. -construct new walls, doors, per plan. core & shell works incld ada compliance restroom & elevator under approved 201503050095; all electrical & mechanical work will be under separate permit; maher n/a.

    Complete Permit 201506259939 $$$ $90,000
  15. Jun 2015

    3rd floor tenant improvement, new walls, doors per plans. core and shell works including ada compliance rest rooms & elevator are under approved permit bpa# 201503201524. all electrical and mechanical work under separate permit.

    Complete Permit 201506260064 $$$ $90,000
  16. Aug 2015

    3rd floor: ti work. new walls, doors, glazing, and ceiling grid system. revision to permit application 201506260064. maher na.

    Complete Permit 201508144344 $$$ $100,000
  17. Sep 2015

    2nd fl ti of exsting office. new non bearing walls, new ceiling grid. core and shell under 201506259939 maher not req.

    Complete Permit 201509015852 $$$ $130,000
  18. Sep 2015

    3rd fl -consists of t.i. to office space for floor lighting & power sys. work consists of connecting power to new or relocated light fixtures, power outlets & tenant equipment. all work consists of making connections to base building existing panels. no changes to base building electrical sys. ref #201508144344.

    Complete Permit 201509025891 $$$ $190,000
  19. Sep 2015

    Modify existing supply ductwork. install 7 new fancoils and 1 exhaust fan. insulation and air balancing.

    Complete Permit 201509086376 $$$ $78,000
  20. Sep 2015

    On ground 1st floor: construct new walls, doors, glazing and ceiling grid system. previous application #201504022684. n/a for maher. adding pantry and coffee kiosk.

    Complete Permit 201509116761 $$$ $1
  21. Sep 2015

    Limited demolition of existing ductwork modification of existing ductwork, insulation as reqd by t-24. furnish & install 7 new vrv fancoils independent a18 balancing.

    Complete Permit 201509167195 $$$ $78,000
  22. Oct 2015

    Project consistes of ti to office space plan for floor lighting & power systems. work consists of connecting power to new or relocated light fixtures, power outlets and tenant equipment.all work consists of making connections to base building existing panels.no changes have been made to the existing base building.

    Complete Permit 201510200159 $$$ $195,000
  23. Nov 2015

    1st floor - furnish & install (9) new vrv fan coils, furnish & install (1) new branch selector, install (1) vrv condensing unit, fabricate & isntall new ductwork, insulation & independent air balancing. ref #201509116761. n/a maher ordinance.

    Complete Permit 201511102286 $$$ $200,000
  24. Apr 2016

    1st floor: project consists of ti to ofc space plan for floor lighting & power systems. work consists of connecting power to new or relocated light fixtures, power outlets and tenant equipment.all work consists of making connections to base bld existing panels.no changes have been made to the existing base building.

    Complete Permit 201604144774 $$$ $160,000

DBI holds 52 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 52. 2 of them are nominal $1 street-space or sidewalk permits.

Not yet documented: the developer, the early tenants and the date of the last recorded sale. Submit an update