139 Townsend Street
Office building
-
1909
Built.
-
Oct 1983
Install new elevator and new stairs.
-
Sep 1997
Provide tenant improvement.
-
Aug 1998
Install system fixture install wall with gypboard.
-
Oct 2000
Construct a few non-struct partitions rework electrical mechanical plumbing & some improvements to restrm.
-
Mar 2001
Oti-1, 1st floor, el, me, ls, sp.
-
Apr 2001
Oti-2 1st floor el me ls sp.
-
Aug 2009
New non bearing dry walled partition walls. construction of a new concrete linear accelerator vault with the coordination of struc, electrical, mechanical components. installation of new suspended clg with coordination of mechanical and electrical. comp., new cabs. new plumbing for new restrooms, new hvac/systems. new lighting.
-
Jul 2011
5th floor-interior improvements of existing lobby & existing office space. new construction consist of installation of new partitions, new finishes, mechanical, electrical & plumbing upgrades. there is no exterior or structural work.
-
Mar 2014
Interior improvements of an existing office on the 5th floor of a commercial office building. new construction will consist of installation of new partitions, finishes, mechanical, electrical, plmg upgrades. no exterior or structural work.n/a for the maher ordinance #155-13.
-
Aug 2014
Ti 3rd fl to construct new walls, doors, finishes, mill work on 3rd fl. mep fire alarms, sprinklers on sep permit maher not req-155-13.
-
Jan 2015
5/f - interior imporovement of an existing office space of a commerical office building; new construction will consist of new electrical upgrades. electrical work only.
-
Jul 2015
Architectural tenant improvement of office space. includes walls, ceilings, flooring and casework. demolition peermit and mep will be separate.
-
Aug 2015
2nd floor: mep for ti 2015 0729 2761. adding new vav units, exhaust fans, split system ac units, ducts and air outlets to suit new space and power. maher na.
-
Aug 2015
Construction of new communicating stair betwwen floors and 2 including opening in structural wood floor deck. mep permit under pa 2015-0805-3372. architectural permit of 2nd floor is under pa 2015-0729-2761.
-
May 2017
Tenant improvement of existing office space - new partitions, new finishes, meup under separate permit.
-
May 2019
Suite 150. interior improvements of existing office space incl non-structural partitions, finishes, lighting and equipment. defferred submittals for fire sprinkler, smoke detection and fire alarm system. n/a for maher.
-
Aug 2019
Interior improvement of an office on the 5th floor of commercial office building. nw construction will consist of modification of existing board room and converted existing conference room to 2 offices. includes finishes, mechanical, electrical, modifiction. no exterior work or structural work. mep deferred.
-
Dec 2019
Suite 150 mezz. interior ti. improvement, new partion, finishes, lighting & equipment n/a maher.
-
Oct 2020
Demolition and replace roof top a/c equipment, new hvac controls system n/a maher.
-
Nov 2020
4th & 5th floor: commercial ti including partitions, flooring, and new conevenience stairs between 4th/5th floor. mep under separate permit.
-
Mar 2021
4th fl: t.i. of an existing office space. new walls. new partition. new finishes. mechanical and electrical work.
-
Dec 2022
G/f: interioir/exterior improvements of an existing lobby, new storefront glass & tenant entry doors, removal of existing awning, replace with metal canopy @ lobby entrance.
DBI holds 171 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 171. 1 of them are nominal $1 street-space or sidewalk permits. 3 expired permits are not shown.
Nearby
- 136 Townsend Street Same street
- 144 Townsend Street Same street
- 133–135 Townsend Street Same block
- 123–131 Townsend Street Same block
- 128 King Street Same block
- 111 Townsend Street Same block
- 680 Second Street Around the corner
- 21 Clarence Place Around the corner