133–135 Townsend Street
Office building
-
1911
Built.
-
Apr 2015
Convert storage to office with small retail. complete building rehabilitation & seismic strengthening. n/a for maher ordinance.
-
Aug 2015
Remove existing non structural, non bearing partition walls. maher na. life safety deferred, if required.
-
Oct 2015
Seismic strengthening of existing building, install new stairs, elevator, restrooms & utilities. no change of use, no exterior changes, stair & elevator penthouses under separate permit. n/a maher ordinance.
-
Jan 2016
Change of use to office occupancy and exterior improvement. work includes installation of new g/f storefront, reh of the upper floor windows, a new roof deck and new elevator/stairs penthouse, interior work under permit application 2015/10/16/9929. ** maher: n/a **.
-
Apr 2016
Provide fire sprinkler coverage for entire building; maher n/a approved arch plan reference #2015-1016-9929. maher n/a.
-
Apr 2016
All floors: mechanical equipment and installation per application #2015-1016-9929. n/a for maher. 16 fsds. fire alarm deferred.
-
May 2016
All floors: general plumbing equipment & installation per permit application 2015-1016-9929. n/a maher ordinance.
-
May 2016
Deferred electrical installation per permit application 2015-1016-9929; maher n/a.
-
Jul 2016
1st floor - revision to bathrooms- see app. 201510169929. exterior changes under separate permit, no storage above 12 ft. n/a maher ord. 155-13.
-
Jul 2016
To build a convienience stair between floors 4th and 5th floor non exit stair.
-
Aug 2016
Interior tenan improvement on floor 5 including offices, conf rooms, break rooms, support spaces etc.
-
Aug 2016
4th floor: interior tenan improvement on floor 5 including offices, conf rooms, break rooms, support spaces etc.
-
Sep 2016
1st floor tenant improvement includes offices, conference rooms, electrical & mechanical. n/a maher ordinance.
-
Sep 2016
1st floor: interior t.i. include all hands assembly, servey, test kitchen mechanical and electrical. n/a for maher.
-
Jan 2017
2/f- interior t.i. to include pffoces. cpmferemce rpp, s & support spaces. mechanical & electrical included. n/a ordinance #155-13.
-
Jan 2017
3/f- interior t.i. to include offices, conference rooms, support spaces, mechanical & electrical included. n/a ordinance #155-13.
-
Mar 2018
Remodel partial 1st floor to personal service, barbershop. adding new partition to build one ada bathroom and washer room, including heating, lighting & power.
-
Sep 2019
Renovation of 200 sq ft lvel 4, removing a lounge area and convert to employee break/pantry.
-
Sep 2019
Reno of 620 sq ft level 4 convert 2 conference rooms to fitness, add a single shower room and 100 sq ft of an l5 to add a single shower room.
-
Oct 2021
New enclosed elevator lobby on floors 4 & 5. 1hr partition in lobby enclosure per cbc3008.7.2, 716.1(2) smoke barrier assembly, (1/3) fire door raiting 45min sidelight in lobby enclosure per cbc 716.1 (2) smoke barrier assembly (3/4) sidelight rating.
-
Jun 2022
T.i on 1st, 2nd & 3rd floors. demolition & construct non-structural partitions, ceilings, finishes, furniture equipment and meps. structural - addition of 2 new stairs btwn 1st & erd floors. new openings are bracing for operable partition.
DBI holds 75 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 75. 6 of them are nominal $1 street-space or sidewalk permits. 4 expired or cancelled permits are not shown.
Nearby
- 130 Townsend Street Same street
- 136 Townsend Street Same street
- 123–131 Townsend Street Same block
- 128 King Street Same block
- 136–138 King Street Same block
- 160 King Street Same block
- 680 Second Street Around the corner
- 670–678 Second Street Around the corner