37.7798, −122.3910 A locator map appears here once a Mapbox token is configured.
Know This Place

District 6 · Block 3794, Lot 022 · ZIP 94107

133–135 Townsend Street

Office building

  • 5 stories
  • 61,000 ft2
  • 11,578 ft2 lot area
  • Zoned M2
  • Historic resource
37.7798, −122.3910 Street View appears here once a Google Maps embed key is configured.
  1. 1911

    Built.

  2. Apr 2015
    Withdrawn Permit 201504143615 $$$ $5,000,000

    Convert storage to office with small retail. complete building rehabilitation & seismic strengthening. n/a for maher ordinance.

  3. Aug 2015
    Permit 201508265330 $$$ $250,000

    Remove existing non structural, non bearing partition walls. maher na. life safety deferred, if required.

  4. Oct 2015
    Permit 201510169929 $$$ $1,500,000

    Seismic strengthening of existing building, install new stairs, elevator, restrooms & utilities. no change of use, no exterior changes, stair & elevator penthouses under separate permit. n/a maher ordinance.

  5. Jan 2016
    Permit 201601086717 $$$ $750,000

    Change of use to office occupancy and exterior improvement. work includes installation of new g/f storefront, reh of the upper floor windows, a new roof deck and new elevator/stairs penthouse, interior work under permit application 2015/10/16/9929. ** maher: n/a **.

  6. Apr 2016
    Permit 201604154854 $$$ $50,000

    Provide fire sprinkler coverage for entire building; maher n/a approved arch plan reference #2015-1016-9929. maher n/a.

  7. Apr 2016
    Permit 201604265697 $$$ $323,000

    All floors: mechanical equipment and installation per application #2015-1016-9929. n/a for maher. 16 fsds. fire alarm deferred.

  8. May 2016
    Permit 201605046471 $$$ $123,000

    All floors: general plumbing equipment & installation per permit application 2015-1016-9929. n/a maher ordinance.

  9. May 2016
    Permit 201605096895 $$$ $302,000

    Deferred electrical installation per permit application 2015-1016-9929; maher n/a.

  10. Jul 2016
    Permit 201607071780 $$$ $20,000

    1st floor - revision to bathrooms- see app. 201510169929. exterior changes under separate permit, no storage above 12 ft. n/a maher ord. 155-13.

  11. Jul 2016
    Permit 201607132249 $$$ $75,000

    To build a convienience stair between floors 4th and 5th floor non exit stair.

  12. Aug 2016
    Permit 201608165088 $$$ $1,032,000

    Interior tenan improvement on floor 5 including offices, conf rooms, break rooms, support spaces etc.

  13. Aug 2016
    Permit 201608296196 $$$ $1,032,000

    4th floor: interior tenan improvement on floor 5 including offices, conf rooms, break rooms, support spaces etc.

  14. Sep 2016
    Permit 201609087032 $$$ $226,800

    1st floor tenant improvement includes offices, conference rooms, electrical & mechanical. n/a maher ordinance.

  15. Sep 2016
    Permit 201609228570 $$$ $540,000

    1st floor: interior t.i. include all hands assembly, servey, test kitchen mechanical and electrical. n/a for maher.

  16. Jan 2017
    Permit 201701197442 $$$ $1,032,000

    2/f- interior t.i. to include pffoces. cpmferemce rpp, s & support spaces. mechanical & electrical included. n/a ordinance #155-13.

  17. Jan 2017
    Permit 201701197443 $$$ $1,032,000

    3/f- interior t.i. to include offices, conference rooms, support spaces, mechanical & electrical included. n/a ordinance #155-13.

  18. Mar 2018
    Permit 201803133553 $$$ $120,000

    Remodel partial 1st floor to personal service, barbershop. adding new partition to build one ada bathroom and washer room, including heating, lighting & power.

  19. Sep 2019
    Permit 201909101140 $$$ $91,440

    Renovation of 200 sq ft lvel 4, removing a lounge area and convert to employee break/pantry.

  20. Sep 2019
    Permit 201909171806 $$$ $72,000

    Reno of 620 sq ft level 4 convert 2 conference rooms to fitness, add a single shower room and 100 sq ft of an l5 to add a single shower room.

  21. Oct 2021
    Permit 202110261167 $$$ $75,000

    New enclosed elevator lobby on floors 4 & 5. 1hr partition in lobby enclosure per cbc3008.7.2, 716.1(2) smoke barrier assembly, (1/3) fire door raiting 45min sidelight in lobby enclosure per cbc 716.1 (2) smoke barrier assembly (3/4) sidelight rating.

  22. Jun 2022
    Permit 202206095947 $$$ $4,126,428

    T.i on 1st, 2nd & 3rd floors. demolition & construct non-structural partitions, ceilings, finishes, furniture equipment and meps. structural - addition of 2 new stairs btwn 1st & erd floors. new openings are bracing for operable partition.

DBI holds 75 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 75. 6 of them are nominal $1 street-space or sidewalk permits. 4 expired or cancelled permits are not shown.

Nearby