123–131 Townsend Street
Office building · South Beach
-
1903
Built.
-
1999
The Southern Pacific Warehouse has been determined eligible for the National Register, one of the warehouse buildings that make up the South End Historic District along Townsend Street.
-
Feb 2000
One-stop, new stairs, assessibility ramps interior, mechanical, electrical, plumbing, arch improvments.
-
Apr 2000
Seismic upgrd of unreinforced masonry building.
-
May 2000
Provide mechanical electrical & plumbing per plan.
-
Sep 2000
Street space.
-
Dec 2003
Structural repairs with shotcrete, seismic upgrade under app#9918172.
-
Jan 2004
Structural frame-out for 2 new exit stairs from g/f thru 6/f includes architectural work interior.
-
Aug 2004
Oti-1 5th floor el, l/s, sp, me.
-
Aug 2004
Oti-1, 2nd floor, el me ls sp.
-
Sep 2004
Oti-1, 6th fl, - el, me, ls, sp.
-
Mar 2005
Construction of a master control, ingest, audio control, video control rooms with associated spaces.
-
Apr 2005
Oti-1 2/f el me ls sp.
-
Aug 2010
3rd floor-demolition of non lead bearing partitions & associated electrical. construction of non load bearing partitions. installation of aluminum framed doors & sidelights. new work stations & finishes. all m.e.p work is design buld.
-
Jun 2014
Tenant improvement of new office space including new partitions, ceilings, lighting, finishes, electrical hvac & plumbing minor structural work to be performed. sprinklers under separate permit ** maher: compliance with ordinance no# 155-13 not required **.
-
Jun 2014
Lower level - install shower, locker rooms, exercise areas & bicycle storage for tenant use. electrical/lighting work included. mechanical, sprinklers, fire alarm under separate permit. change from storage to partial storage & exercise room. n/a maher orinance.
-
Nov 2014
This is a revision to current building permit #2014-1028-0062. scope includes replacement of men & womens restroom, upgrade to coffee area, installation of new conference rooms & phone booths. mep to be submitted under seperate permit.
-
Nov 2015
5th floor - non-structural construction of partitions, door, ceilings, electrical, mechanical, plumbing, lighting, millwork & finishes. fre life safety & electrical deferred. maher na.
-
Dec 2016
3rd floor: ti - of an existing full floor suite. non structural demolition of interior partitions & door/frame/hardware. lighting & finishes. new non structural interior partitions & doors/frame/hardware. new ele/plumb/mechanical & lighting & life safety to tie into existing bld. new millwork & finishes maher na.
-
Mar 2017
Mechanical & electrical work for tenant improvement on the 3rd floor. ref pa 2016-1230-6268.
-
Mar 2019
Interior ti improvement to include: selective non structural demolition of partitions, doors, lighting & finishes. construction of non structual partitions, doors, millwork, finishes, lighting electrical, mechanical, & plumbing.
-
Oct 2019
Partial 4th floor interior t.i. to include: non-structural demolition; construction of non-structural partition, doors, millwork, finishes, lighting, mep n/a maher.
-
Oct 2020
Reroofing.
-
Feb 2022
1st floor t.i. of an existing partial floor unoccuppied suite. scope includes non-structural demolition, new non struc. glass partitions, accent lighting, millwork, & floor & wall finishes. restroom accessibility upgrades new plmg fixtures and floor & wall finishes. no change in occupancy, use or areas.
DBI holds 171 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 171. 7 of them are nominal $1 street-space or sidewalk permits. 3 expired or cancelled permits are not shown.
Nearby
- 111 Townsend Street Same street
- Inglenook Vineyard Agency Same street
- 133–135 Townsend Street Same block
- 101 Townsend Street Same block
- 139 Townsend Street Same block
- Garcia & Maggini Warehouse Same block
- Moore Shipbuilding Around the corner
- Moore Investment Company Building Around the corner