101 Townsend Street
Industrial building
-
1913
Built.
-
May 1996
Demolition of interior n/b partition walls const. new restrm.
-
Aug 2004
Reroofing.
-
Feb 2008
Interior tenant improvement to construct new non load bearing partitions, install new lighting, new wall finishes and new floor finishes on the ground floor.
-
Nov 2013
Interior demolition, add interior stairs & elevator, add seismic walls & footings, lower basement slab 2'-0".
-
Apr 2014
New restrooms & hvac for warm shell. new windows @ 2nd & 3rd floor. new glass roll up doors. paint & patch exterior. new roof deck with stair & elevator penthouses. ** maher: compliance with ordinance no# 155-13 not required **.
-
Oct 2014
3rd floor: t.i. includes the build out of the 3rd floor with non-structural partitions, ceiling, lighting & finishes. mep included (building not sprinklered); building not sprinklered. life safety under separate permit. change use under ap#2015.0505.5374. maher n/a.
-
Oct 2014
2nd floor - t.i. includes building out with non-structural partitions, ceiling, lighting and finishes. mep included. life safety under separate permit. change of use under ap# 2015-0505-5374. maher n/a.
-
Oct 2014
Basement t.i. - includes the build out of non structural partitions, ceilings lights and finishes. mep under separate permit. life safety under separate permit. maher n/a.
-
Oct 2014
1st floor - change use and t.i. improvement include teh non-structural partitions, ceilings, lighting and finishes. all new hvac tied to base building system. electrical, plumbing and life safety under separate permit. maher n/a.
-
Apr 2015
Basement t.i. includes building out of basement level with non-structural partitions, mep included (building not sprinklered); change of use under ap# 2015.0505.5374. maher n/a.
-
Apr 2015
1/f t.i. include build out of the 1st floor with non-structural partitions. mep, electrical & plumbing included. life safety work under separate permit. (building not sprinkelered). change use under ap# 201505055374. n/a maher.
-
Jul 2016
Construction of new side deck. project would construct a new side deck and trash storage enclosure. the deck would be approximately 950 sq ft. & +/-f5 ft above existing finish grade; maher n/a.
-
Jan 2017
T.i for change to cafe use. hvac works inclued tied into existing building system. new commercial cafe t.i. to include new air handler, new restroom, electrical & plumbing. cabinets & kitchen equipment. ** maher: n/a **.
-
Feb 2018
Create (3) communicating opening on a shared wall between 101 & 111 townsend st at 1st, 2nd & 3rd foors. add 1 gender neutral bathroom @ 101 townsend.
-
Mar 2021
Demolish a few fixed offices/phones/conferences including interior partitions, storefronts, doors/frames, ceiling tiles, lighting & power/data. in additon a wide mesh partition & casework @ coffe area is being removed.new scope includes a few offices/phones/conferences with new ceiling tiles.
-
Mar 2021
Sawcut existing concrete floor slab opening at ground level for future stair. add temp barricade around new slab opening. change room function of existing all hands space to new open collaboration space. add new interview suite with high ceiling and lighting. add new reception desk and mother's room.
-
Mar 2021
Flip existing steel picket gate and man door. add new metal mesh panel screens to existing gate. remove partial existing deck boards, deck supports and guardrails at 101 townsend. provide new wood slat fence and new security fence door at existing deck. add guardrail at 2 existing garage door openings.
-
Jul 2021
Mechanical and electrical work for t.i. on 3rd floor. ref# 2021-0309-6202.
-
Aug 2021
Ground floor: mechanical and electrical work for t.i. ref arch #202103297470.
-
Sep 2021
Basement: demolition select interior partitions, storefront, door frames, ceiling tiles, lighting/power/data, new interior partitions, ceiling tiles, minor lighting rework, upgrades power/data & some flloring, k new interconnecting stair @ existing opening, new ramp & 1-hour passageway @ pass through.
-
Feb 2022
Mep for ti nes fsd's for b32 passage way; furnish and install new low side dict and registers; provide new lighting ref pa 2021-0921-8853 and 2021-0921-8855.
-
Feb 2022
2nd fl - demolition of select partitions, ceilings, lighting & finishes. new non-bearing wlls, ceilings, finishes, millwork & lighting. no change of use area or occupancy.
-
May 2022
2nd fl: mechanical and electrical for tenant improvement. ref permit application 202202258755.
DBI holds 76 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 76. 1 of them are nominal $1 street-space or sidewalk permits. 1 cancelled permit is not shown.
Nearby
- 100 Townsend Street Same street
- 111 Townsend Street Same street
- 123–131 Townsend Street Same block
- 133–135 Townsend Street Same block
- 128 King Street Same block
- 139 Townsend Street Same block
- 680 Second Street Around the corner
- 670–678 Second Street Around the corner