645–649 Fifth Street
South Of Market · San Francisco, CA 94107
Permit history
-
Oct 1983
Relocate office walls/partitions, lighting.
-
Jul 1985
Convert lobby into enclosed aerobics room.
-
Dec 1985
Repair exist water damage in bathrms/bld new handicap bathroom.
-
Mar 1986
Install new interior glazing, build new classroom.
-
Jun 1990
Work at roof to repair control joint.
-
Dec 1990
Remodel lobby, const. new bar area demolition light/hvac.
-
Dec 1990
Handicap upgrade, new finishes, fire doors at ground level.
-
Apr 1992
Remmodel lobby meeting rooms, dining rms, and courtyard.
-
Sep 1993
Remodel men's locker room.
-
Aug 1995
Sub-divide existingstorage with non bearing, build new toilet.
-
Aug 1998
Reroofing.
-
Sep 1998
One-stop, h/c restroom involves enlargement under roofed area.
-
Sep 1998
One-stop, replace existing chainlink fence with new, same type, height.
-
Mar 2001
One-stop: m.tjoe: const. a t i space in the second fl of a parking garage for a telecom facility.
-
Apr 2009
Remodel of the existing locker rooms & shower area. also upgrading mechanical, electrical & plumbing; reconfigure egress path and exit corridors; also occupant load verification for p-142 permit.
-
Jun 2009
Revision to application 200904216786. existing hot tubs removal needs new structural floor infill.
-
Sep 2009
New replacement suspended ceilings, re-use of existing light fixtures & hvac grilles @ 3rd. floor. (main lobby & cafe).
-
Dec 2009
Remodel 2 existing fitness studios, new flooring, paint, ceiling work and interior entry door.
-
Feb 2010
Revision to permit application 2009-1216-3309-soffit modification in exercise room.
-
Mar 2019
West building. erect 15-story, type 1a, 2 basement, office and retail building. maher compliance with ord 155-13.
-
Mar 2019
Erect a recreational 5-story, 2-basement building(podium). type i-a.
-
Mar 2019
East building. erect 12-story, type 1a, 2 basements, office and retail building. maher compliance with ord 155-13.
-
Sep 2019
To demolish 3 stories tennis club. ** maher: n/a **.
-
Sep 2020
Temporary support of excavation system consisting of a tiedback slurry diaphragmwall (d-wall) for new constuction. ref permit application 's 201903215872, 201903215873, 201903215884.
-
Feb 2021
Install two (2) new 8" underground fire service 5'-0 stubouts. underground fire line installation and review for approval of new water connection.
DBI holds 60 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 60. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update