Permit history
-
Mar 1990
Repair cracks, reinforcement to bricks.
-
Jun 1993
Parapet bracing.
-
May 1994
To comply with umb ordinance.
-
Oct 1997
Reroofing.
-
Apr 1998
Work under construction 388 townsend bpa9701903, shoring, pinn.
-
Jul 1998
Reroofing.
-
Nov 2000
Remodel & refurbish all 3 floors, upgrade bathrms to ada compliance. add two new exit stairs. mechan.
-
Apr 2014
To erect 5 stories of office building - compliance with maher ordinance no.155-13 required route to health.
-
May 2014
Demolition a commercial building.(compliance with mahner ordinance no.155-13 required).
-
Jan 2015
Install underground pipe from existing 6" fire service underground to flange above floor slab. ref. appl. 2014.0407.2588.
-
May 2015
New fire alarm for entire bld: 1 facu. 1 power supply. 1 annunciator. 22 modules. 1 pull station. 15 smoke detectors. 3 heat detectors. 19 duct detectors. 21 horn/strobes. 11 strobes. ref pa 2014 0407 2588.
-
Jul 2015
Installation of 27 windows at property line associated with 201404072588. t24 under separate permit maher not req.
-
May 2016
Installation of emergency generator to the roof, piping details, associated structural, mechanical and electrical. n/a for maher.
-
May 2016
1st floor tenant improvement including demolition of interior non-structural partitions & build back of new partitions, doors, millwork & ceilings. mep & l/s under separate permit. ref permit application 201404072588 site permit office building only. n/a maher ordinance.
-
May 2016
Ist floor: mep associated with approved #2016-0517-7688. works including new coils, exhaust fan, ductwork & lighting.
-
May 2016
Tenat improvement on the 2nd, 3rd and 4th floors including minor demolition. construction of non structural partitions, doors, millwork, ceilings and associated mep. fire life safety under separate permit. maher na.
-
May 2016
Ti on the 5th floor & roof including minor demolition, construction of non-structural partitions, doors, mill work ceilings & finishes & associated mep. fire life safety under separate permit. maher na.
-
Jun 2016
New fire alarm devices added to tenant improvement in an existingbldg to include 1 power supply, 3 sd, 49relay modules, 1 voltage relay, 2 dual monitor modules 48 duct detectors, 18 strobes 57 horn/strobes, ref. 201605177688(1st floor)201605258391 (2, 3, 4thflr)201605258386(5th & roof); maher n/a.
-
Aug 2016
Entire building fire sprinkler system for tenant improvement - 22 relocated, 11 added, & 6 removed sprinklers. ref #201404072588. n/a maher ordinance.
-
Aug 2016
Work associated with approved pa 2016-0525-7386 for the addition of room terrace paver system, planters & benches.
-
Sep 2016
Existing plans for sffd place of assembly permit.
-
Apr 2021
Voluntary modify existing fire alarm system; add/remove devices.
-
May 2021
Ti on the 2nd fl to create two new shared offices. mechanical & electrical included.
-
Jun 2021
Existing fire sprinkler system - tenant improvements relocated 8 sprinklers.
DBI holds 35 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 35. 7 of them are nominal $1 street-space or sidewalk permits.