Permit history
-
May 1982
New construction.
-
Jul 1986
New construction.
-
Apr 1991
Tenant improvement non structural no change in use.
-
Apr 1992
Addition of 2 elevators, 2 stairways, a lift and conveyor.
-
Jan 1993
New partns-instl dr, strfrnt-reloc mechanical duct relo sprnk bath.
-
May 1993
Addition of steel elements to exterior of building.
-
Mar 2001
Additions alterations or repairs.
-
Jan 2002
2/f interior remodel remodel new partitions ceilings lighting electrical mechanical plumbing fire pr.
-
Jan 2002
Remodel existing 1 & 2 floor retail, new partition/electrical/bridge to connect 2 retail area.
-
Apr 2007
Interior t.i for coffee cafe & retail sales, interior soft demolition, new walls, new lighting, new ducting, new finishes, new casework, new equipment. change of use.
-
Jun 2011
#83 new 4715 sq ft tenant improvement of existing gr floor retail space ina 2 story building for branch bank. work includes new interior atm. non structural partitions, ceilings, soffits, finishes, furniture, related hvac, electrical, plumbing.
-
Jan 2013
Interior tenant remodel for an existing 2 story nordstrom rack dept. store. t.i. work includes new finishes, new non structural partitions. new carework for a retail sales floor. personnel offices. stock storage and associated electrical, plmg and mechanical system.
-
Apr 2016
Interior t.i. within existing shell building. to include new fixtures, finishes and equipment. mep included. n/a ordinance #155-13.
-
Oct 2021
Remodel of existing 1 story retail grocery store project, new break room & relocation of restrooms in theexisting back of house path of travel & facilities serving the proposed expansion/alteration are to remain in compliance with cbc ib-2024. mep & fire deferred.
-
Feb 2022
Remove existing steel window awnings. remove existing exterior wall plaster treatment. removeal of existing exterior steel ornamentation cages. installation of new steel canopies. paint entire exterior. ada improvements.
-
Mar 2023
Core and shell improvement: removal of elevator & shaft, removal of stair, slab infill and floor strengthening.
-
Jun 2023
Storefront removal & install new storefront @ 2nd level. restripe parking & light replacement.
-
Sep 2023
Interior ti for new retail store fit out. work includes full interior fitout including partitons, restrooms, doors, hardwarde, fixtures, finishes.
-
Nov 2025
Level 2 build out of fitness facility.
-
Nov 2025
Floor strengthening and hvac equipment replacement. wiring for hvac units on roof under separate ti permit.
-
Dec 2025
Level 1 ti for build out of fitness facility.
-
Apr 2026
Back of house expansion existingground level occupying additional 1393 sq ft of former tenant sapce. work includes new relocated walk-in freezer, expanded breakroom. path of travel and facilities serving the expansion are to remain in compliance with cbc 11b-2024.
-
Jul 2026
Suite b. interior tenant improvement of a retail bank. demolition of non structural partitions, ceiling and finishes. exterior improvements work painting, new night deposit and atm.
-
Aug 2026
Ste 1b - core shell work ahead of t.i.. new stair, replacement of glazing @ 1st floor slab work.
DBI holds 240 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 240. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update