525–559 9th Street
Store building
-
May 1982
New construction.
-
Jul 1986
New construction.
-
1991
Built.
-
Apr 1992
Addition of 2 elevators, 2 stairways, a lift and conveyor.
-
Jan 1993
New partns-instl dr, strfrnt-reloc mechanical duct relo sprnk bath.
-
Mar 2001
Additions alterations or repairs.
-
Jan 2002
2/f interior remodel remodel new partitions ceilings lighting electrical mechanical plumbing fire pr.
-
Jan 2002
Remodel existing 1 & 2 floor retail, new partition/electrical/bridge to connect 2 retail area.
-
Apr 2007
Interior t.i for coffee cafe & retail sales, interior soft demolition, new walls, new lighting, new ducting, new finishes, new casework, new equipment. change of use.
-
Jun 2011
#83 new 4715 sq ft tenant improvement of existing gr floor retail space ina 2 story building for branch bank. work includes new interior atm. non structural partitions, ceilings, soffits, finishes, furniture, related hvac, electrical, plumbing.
-
Jan 2013
Interior tenant remodel for an existing 2 story nordstrom rack dept. store. t.i. work includes new finishes, new non structural partitions. new carework for a retail sales floor. personnel offices. stock storage and associated electrical, plmg and mechanical system.
-
Apr 2016
Interior t.i. within existing shell building. to include new fixtures, finishes and equipment. mep included. n/a ordinance #155-13.
-
Oct 2021
Remodel of existing 1 story retail grocery store project, new break room & relocation of restrooms in theexisting back of house path of travel & facilities serving the proposed expansion/alteration are to remain in compliance with cbc ib-2024. mep & fire deferred.
-
Mar 2023
Core and shell improvement: removal of elevator & shaft, removal of stair, slab infill and floor strengthening.
-
Jun 2023
Storefront removal & install new storefront @ 2nd level. restripe parking & light replacement.
-
Sep 2023
Interior ti for new retail store fit out. work includes full interior fitout including partitons, restrooms, doors, hardwarde, fixtures, finishes.
-
Nov 2025
Level 2 build out of fitness facility.
-
Nov 2025
Floor strengthening and hvac equipment replacement. wiring for hvac units on roof under separate ti permit.
-
Dec 2025
Level 1 ti for build out of fitness facility.
-
Apr 2026
Back of house expansion existingground level occupying additional 1393 sq ft of former tenant sapce. work includes new relocated walk-in freezer, expanded breakroom. path of travel and facilities serving the expansion are to remain in compliance with cbc 11b-2024.
-
Jul 2026
Suite b. interior tenant improvement of a retail bank. demolition of non structural partitions, ceiling and finishes. exterior improvements work painting, new night deposit and atm.
-
Aug 2026
Ste 1b - core shell work ahead of t.i.. new stair, replacement of glazing @ 1st floor slab work.
-
August 28, 2026
Sprouts Market Plans First SF Store at Former Nordstrom Rack Site on Ninth Street — SFist
DBI holds 240 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 240. 7 of them are nominal $1 street-space or sidewalk permits. 3 expired or cancelled permits are not shown.
Nearby
- 450 9th Street Same street
- 530–540 Ninth Street Same street
- 934 Brannan Street Same block
- 1045 Bryant Street Same block
- 1011 Bryant Street Same block
- 1000 Brannan Street Around the corner