934 Brannan Street
South Of Market · San Francisco, CA 94103
-
1906
Built by the Western Pacific Railway as one of the corrugated steel structures the railroads put up cheaply for new tenants after the earthquake; designed by the company's chief engineer V. G. Bogue and built by Thomas H. Day & Sons. Long the home of the Union Machine Shop, and the only one of these buildings known to survive in the survey area. Engineered by the Western Pacific engineering office.
-
May 1985
Structural rehab to conform to seismic requirements etc.
-
Jul 1986
Completion of auto fire sprinkler protection system.
-
Feb 1991
Plane doors, replace door, remove existing concrete & masonry.
-
Jan 1996
Install new raised floor, entry doors, ramps, men & womens restrm.
-
Aug 1996
Install panic hardware on exterior existingdoor front side of bld.
-
Jul 1998
Paving driveway to private wheelchair access at rear entranc.
-
Jul 1999
Install new detectors and devices to exsisting panel.
-
Aug 2000
Modification to sprinklers.
-
Sep 2000
New partitions to form new art work areas & display room, replace existing ext double doors & transom, al.
-
May 2001
Renew appln #200008228610 revise 3 additional heads.
-
Nov 2001
Installation of new fire alarm system to replace existing fire alarm system.
-
May 2002
Renew appn. 200105300258 & 200008228610.
-
Dec 2004
Disabled access imporvements in city owned building, pubilic financed project.
-
Sep 2005
1st floor-relocate a existing of 1&1/4" fire sprinkler pipe to clear the new stairway.
-
Sep 2007
Revision to appl#200412131283 change occupancy load from 1021 to 1144 at exhibit & performance art area @ ground floor of building.
-
Dec 2010
Replace existing building furnaces with newer, more efficient furnaces. the project's purpose is an energy efficient project.
-
Jan 2011
Replace 6 existing gas fired furnaces to go back in same locations with new equipment.
-
May 2011
Remove and replace 5 unit heaters and 1 furnace. install new thermostat controls.
-
Oct 2014
Remove 37 smoke detectors from system, add 2 beam detector to the system. add one strobe to the fire alarm system. n/a for the maher.
-
May 2015
Reroofing.
-
Mar 2019
Mod- site area: (add alternate)add extior paving, gratings, fence gates, sidewalk ramp & curb ramp; 1st floor: add lula access, machine room & stairs; 2nd floor: add lula access, toilet room & stairs. **maher n/a**.
-
Apr 2022
Fire alarm ti: a new fire alarm control panel in being installed to replace existing obsolete unit. adding new cellular transmitter and remote annunciator to new nofifier nfs 640 fire alarm system.
-
May 2023
Revision to 201903114916. site area: change the sidewalk to match the new driveway and provid truncated domes along the pathy, remove concrete stem wall, provide wood retaining wall along the property line, provide 12" trench on driveway. simplified landscape. added partial fencing.
-
Apr 2026
Revisoin 201903114916- 1/fl added scope in the existing mens restroom to meet ada requirements. remove existing fountain and install a new ada compliant. replace flooring in both restrooms. 2/fl retain existing restrooms in/out modfications. remove proposed all gender restroom from scope. relocate kiln and exhaust.
DBI holds 34 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 34.
Not yet documented: the architect, the early tenants and the date of the last recorded sale. Submit an update