1045 Bryant Street
South Of Market · San Francisco, CA 94103
-
1916
Built as the Western Union Branch Telegraph Office, brick construction. Built by F. H. Barnes.
-
Jul 1985
Replacing fire damgae.
-
Nov 1989
E.w.o. (s).
-
May 1996
Sismic upgrade existing building under "special procedure".
-
Jul 1998
Renew expired appn. 9622315.
-
Nov 1998
Reroofing.
-
Feb 1999
Remove woodn sash only in 14 front windows-nochanges in size.
-
Jun 2000
Install 18 aluminum windows in kind.
-
Mar 2005
Voluntary upgrade for fire safety to provide one hr rated enclosure at existing stairway & elevator shaft.
-
May 2013
Demolition of all non structural and non load bearing interior tenant partions and associated ceiling, walls, glazing, doors & finishes on floors 1, 2 & 3. no structural demolition involved under ab017.
-
Aug 2013
Intall 11 aluminum repalcement windows in kind ground floor in existing openings.
-
Sep 2013
Structural work including wood framing for 2 new staircases and limited stud frame load bearing walls, elevator pit and floor. infill at existing at existing openings under ab-17.
-
Oct 2013
New core & shell systems including new stairwells, elevator, furnace, bathrooms and associated mechanical & electrical work under ab017. life safety & sprinkler under seperate permit. permit exterior work under separate permit.
-
Dec 2013
Relocate 119 upright sprinkler heads between the 1st and 3rd floors. relocate 21 pendent sprinkler heads. upgrade end of branch line bracing. (ref. t.i.# 2013/0904/5883).
-
Jan 2014
New fire alarm system for an existing building currently being remodeled, (1) facu, (1) annunciator, (2) monitor modules, (3) dual monitor modules, (10) relay modules, (11) voltage relays, (1) pull station, (1) heat detector, (12) smoke detectors, (4) duct detectors, (6) strobe, (9) horn/strobes.
-
Jan 2014
1st, mezz & 3rd floor new tenant improvement consists of new partitions, new pantry, new finishes & new lighting, mep & sprinklers & ls under separte permit. compliance with ordinance #155-13 not required.
-
Feb 2014
Floors 1, mezz, 3rd: mechanical and electrical work associated with approved app#201401216697 including new duct work, new exhaust fan and new ac unit. n/a for the maher ordinanace #155-13. n/a for the interim control #428-13.
-
Mar 2014
New fire alarm devices for a t.i. to an existing building. 1 power supply, 1 control module, 2 smoke detectors, 1 weatherproof strobe, 8 ceiling strobes, 9 horn/strobes. ref#201310310824. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13.
-
Mar 2014
Relocate 4 upright sprinklers on the 1st floor. relocate 3 uprights on the mezzanine level. relocate 5 uprights on the 3rd floor. add 2 sprinklers. delete 2 sprinklers.ti 201401216697.
-
May 2014
T.i. on 2/f consisting of new partitions, lighting, finishes and associated mechanical & electrical work, ls & sprinklers under seperate permit ref 201310310824 (base building upgrade). n/a ordinance #155-13.
-
Jun 2014
Lighting & finishes for market ready conditions on the 1st floor & mezzanine - adding new unisex restroom.
-
Jul 2015
New interior tenant improvements (interior partitions & finishes) on the ground floor & mezzanine, mep & fire life safeety under separate permit; maher n/a.
-
Jul 2015
Construction of awning. n/a maher ordinance.
-
Jul 2015
Mechanical associated with permit application 201507242382. n/a ordinance #155-13.
-
Aug 2015
Install (2) halo illum letters & logo on wall use () 120v sign circuit or provided by others for hook up. maher na.
-
Oct 2021
Reroofing.
DBI holds 50 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 50. 8 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and the early tenants. Submit an update