737–747 Folsom Street
South Of Market · San Francisco, CA 94107
-
Feb 1986
New construction.
-
1987
Built by the Tenants and Owners Development Corporation as low-income housing and named for Peter Mendelsohn, co-founder of Tenants and Owners in Opposition to Redevelopment, the group that fought the Yerba Buena Center clearances.
-
Oct 1987
Fire sprklr system @ 1st floor only.
-
Apr 1988
Revision to work in progress #8601746.
-
Aug 1988
New handicap ramps aded to side walks at entrance of building.
-
Aug 1988
Landscaping, irrigation & flat work at courtyard of building.
-
Aug 1988
Remodel ground floor for dining & multi purpose room.
-
Jun 1989
Horizontal addition.
-
Feb 1990
T/i to 5000 sq ft. of vacant ground floor retail space.
-
Jul 1990
Revision to approved permit 646766 (9003105).
-
Aug 1990
Lowering of existing fire sprinkler heads.
-
Dec 1990
New concrete ramp & paving in ground level garden.
-
Apr 1991
Install automatic easy access series entry system on existingdoor.
-
Jun 1991
Install 8 lineal feet of ceil high 1 hour & sheet rock.
-
Mar 2000
Unmanned antennas installation for wireless transmission facility, antennae with be mounted to face or.
-
Mar 2011
Replace ddcv backflow preventer. ames 3000 dcda removed. replace with 3000 55.
-
Jul 2011
Install 3 new lamp posts 20' high with footings; install 3 new led light fixtures; re-top existing 150'x3' walkway with blacktop (grades, slope and width to remain); remove existing benches for community garden associated with property at 737 folsom.
-
Jul 2013
Reroofing.
-
Jun 2023
Full fire alarm system retrofit of the existing f/a system service residential uniters per sq ft 2016 oridinance 165-16, sq ft ordinance 077-21, 2019 sffc 1103.7.61.1 and 2022 nfpa72 ss18.4.5.
-
Nov 2023
Revision to previous permit 202306301298. owner reqeuest to previous approved tone-based system is changed to be a voice exacuation on a voluntary/non-required base system.
-
Jan 2025
Request for as-built review plans for 202311070339.
-
Apr 2025
Add a new automatic fire sprinkler system with a new fire pump on 1st floor. install heads in floors 2-9 in corridors and install 1 sprinkler is each unit entrance for future installation.existing sprinkler system on the fist floor to remain.
-
Jun 2025
Remove existing standing seam roofing and plywood sheathing. inspect and repair metal decking. install pmma system: install new 5/8" dense deck sheathing. install siplast probase mb base sheet. install siplast parapro roofing system. window glazing and sealant.
-
Sep 2025
Revision to 202506128539. to document the replacement of metal decking in kind.