Apr 1982
Additions alterations or repairs.
-
Oct 1984
New partitions, panels, carpet & general upgrading 4/f.
-
Aug 1995
Cti-1 (el me sp) 5th fl.
-
Sep 1998
Remodel 2nd & 3rd floors with bathroom upgrades.
-
Jul 1999
Voluntary seismic upgrade for building horizontal anchor bolts.
-
Sep 1999
Oti-1 4th floor el me l/s sp.
-
Sep 1999
Oti-1 5th floor el me l/s sp.
-
Oct 1999
Oti 1 6th floor, el, me, ls & sp.
-
Dec 1999
Oti-2 el me sp 6th floor.
-
Sep 2000
Oti-1 (1st fl.) el, me, ls and sp.
-
Aug 2005
Oti-1, 4th floor, el, ls, sp, me.
-
Aug 2005
Oti-1 5th floor, lg, me, ls, sp.
-
Aug 2005
Oti-2 5/f el, me.
-
Dec 2007
Office building t.i.: includind non-bearing partitions, new ceiling, new mill work and finishes. lighting, hvac, mechanical, t-24: under separation permit.
-
Feb 2008
Demolition six exhaust fans & installing three new exhaust fans for the building pressurization system. work to be done at roof penthouse.
-
Feb 2010
3rd floor-office t.i. select demolition of walls, ceiling. construction of new walls, shower rooms & restrooms. m.e.p, fire sprinkler under seperate permit.
-
Jul 2016
2nd floor: ti-constist of selective demolition of non structural partitions, new non structrual partitions, doors, millwork. mep/fire/life safety under sep permit maher na.
-
Jul 2016
4th floor: ti- to include demolition of non structural partitions. new partitions, doors, millwork. mep/fire/life safety under sep permit. maher na.
-
Jul 2016
5th floor: ti- demolition of non structural partitions. new partitions, doors, millwork. mep/fire/life safety under sep permit maher na.
-
Aug 2016
Alteration work to the roof level to provide a terrace as an amenity/assembly to the existing building occupants. work includes addition of elevator lobby at roof, raised decking & planting, enclosed exit stair to connect to existing exit stairs. walls, doors, finishes per plan. *maher: n/a*.
-
Sep 2016
2nd floor: mechanical & electrical work for ti ref 201607122059. maher na.
-
Jul 2018
Demolition removal of existing partitions, doors, flooring & ceilings. construction of non structural parititons, new doors & finishes. n/a for maher.
-
Jun 2021
3rd fl: ti - slective interior demolition, removal of existing partitions, doors & existing partitions, doors, ceiling. restroom renovations. ref pa 2016-0830-6376.
-
Aug 2025
Level 1, interior demolition of non-structural elements including partitions, doors, finishes, ceilings, lighting. demising grand floor lobby, construction of fitness center. conference room and lounge include path of travel and restroom upgrades. mep. life safety and sprinkler under separate permit.
-
Dec 2025
Deferred mechanical and electrical for permit application 2025-0821-3678. mechanical: provide new vav boxes, water source heat pumps, diffusers & associated low side duct work to serve new zones. provide exhaust fan & associated ductwork for new restrooms. electrical: light fixtures & associated circuiting controls.
DBI holds 253 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 253. 8 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update