942–946 Mission Street
South Of Market · San Francisco, CA 94103
Public art
- Untitled
Mosaic tiles; hotel lobby; artwork is always accessible.
An interior mosaic in the hotel lobby depicts a cityscape with a bridge in blue and orange tones; the artist is not named in the source. The city's inventory titles it “None”.
Permit history
-
Jul 1982
Building use: store.
-
Mar 1983
Additions alterations or repairs.
-
Jan 1984
Install new non structural partitions & suspended ceiling.
-
Jul 2000
Renovation of 2nd floor, remove partitions, reconfigure bathrooms to ba handicapped access, convert.
-
Oct 2000
Change g/f use to offices (8, 000) sq ft. seismic upgrade of building install new handicap accessible.
-
Nov 2000
Renew app #200007104746 and for electrical & mechanical wrk under #200010173718.
-
May 2001
Revise to app #200010173178/s3 architectural slight change in bathrm dteails new location for new ha.
-
May 2001
Revise to app #200010173178s provide sprinklers per plans.
-
Jun 2001
New fire life safety stystem for 2 floor plus 1 basement 1st fl, 2nd fl bsmt.
-
Aug 2001
Revise to app #200010173174s3 provide rear door encroachment provide power access opening for front.
-
Aug 2004
Add 12 new strobes to improve audio/visual doverage on b, 1st, 2nd floors. devices added to existing f.
-
Nov 2004
Oti-1 g/f el, me, sp.
-
Jan 2005
Revision to permit app 200411240121- construct new dressing rm at ground floor with accessible shower. re.
-
Apr 2005
T.i.of existingoffice space(entire g/f)for remodel & change of use to arts & entertainment.
-
Jun 2006
Minor construction of office partitions, conference room. sprinkler work to be under separate permit.
-
May 2011
Erect a 15 story 174 guest room hotel.
-
Aug 2012
Demolish 2 stories, warehouse.
-
Nov 2012
Raker brace shoring at existing vault on mission street. solider beam tieback shoring on jessie street.
-
May 2013
Fire sprinklers for new 18 story hotel.
-
Jul 2013
Installation of new fire alarm system & devices.
-
Jun 2014
To erect 2 electric signs "hampton inn"; (signs d & e)compliance with ord 155-13 not required.
-
Sep 2014
Install an elevator landing emergency 2 way communication system that meets all nfpa 72-2010 chapter 24. applicable requirements. same as area of refuge 2 way communication system.
-
Jan 2015
Construct a mosaic tile artwork wall include light-gage stud furring drywall panels and lighting. work in entry level corridor of the hotel. revision appl. #2011.0513.6051. maher n/a.
-
May 2015
Install emergency evacuation signs inside building; maher n/a.
DBI holds 51 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 51. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants, when each artwork was installed and who designed the open space. Submit an update