Nov 1985
Erect sign.
-
Nov 1986
Canvas canopy over entrance door (retail store).
-
Aug 1993
Reroofing.
-
Aug 1993
Reroofing.
-
Sep 2000
Interior renovation of the 2nd floor/new office partition.
-
Jan 2001
Hvac sprinkler, electrical, construction - 2nd floor, 200009190947.
-
Oct 2008
Rmove existing steel windows and doors and installing new aluminum window in the same location. from 2nd through 5th floor on mission. visible from the street.
-
Oct 2011
Demolition only. existing occupancy to be addressed under seperate pemit per ab-017.
-
Jan 2014
Elevator recall system to be installed. excavation <50 cu.yd.per 2013 nfpa 13 and asme a17.1. compliance with ordinance #155-13 not required.
-
Oct 2015
Replace existing windows at front facade existing steel shash to be replace with aluminum sections in kind due to rust & deterioration.
-
Aug 2016
5th floor level only - barrier removal, remodel exisitng toilets & lunch room area & janitorial closet, kitchenette. n/a maher ordinance.
-
Aug 2016
5th floor: title 24 restroom area. ref permit application 201608034080 maher na; building is type iii-b construction; instead of i-b.
-
Jul 2017
New concrete reinforced slab for new sidewalk door, approx 50 sq ft sidewalk subbasement maher not req.
-
Oct 2017
Replace existing steel shash windows in kind due to rust and deterioration with double insulated glazing. no interior work.
-
Aug 2018
5/f -demolish door, sidelite and portion of wall, construct new walls, doors, sidelites, ada case work, power outlet and light fixtures, extend kitchen with sink and dishwasher, install 3 hvac units.
-
Oct 2018
Ref permit application 201808157412: modification of fire sprinkler system per t.i. total added 10 new, 9 relocated. (5th fl).
-
Oct 2018
Installation of 14 new notification devices. 12 strobes, 2 horn-strobes. all work on the 5th floor.
-
Dec 2018
Correct (3) duct smoke detectors to the fire alarm system.
-
Sep 2019
Barrier removal: replacement of existing elevator with new larger elevator, work also includes new elevator machine room penthouse, to replace existing mep, title 24 enerry calc, fire sprinklers, life safety, & elevator construction under separate permits: 201912200109.
-
Dec 2019
Barrier removal project to include: removal of elevator and enlargement of elevator shaft in preparation for new elevator, work also includes new finishes and lighting at elevator lobby, mep, title 24 energy calcs, fire sprinklers and life safety under separate permit.
-
Dec 2020
New security gates/grilles at storefront & mezzanine windows of ground floor tenant space.
-
May 2022
Elevator lobby: adding 14 sprinkler heads.
-
Nov 2022
Provide elevator recall for elevator upgrade. installation of smoke detectors in elevator lobbies on each floor.
-
Apr 2024
Construction of new electrical utlitly room located at basement. separate mep & fire/life safety permits will need to be obtained.
-
Apr 2025
Installation of smoke detector in new electrical room in the basement.