410 Townsend Street
Office building
-
1912
Built.
-
1912
The Nathan, Dohrmann & Co. warehouse, the first of the Bluxome and Townsend Street warehouse node (a potential historic district of nine intact industrial buildings identified by Page & Turnbull).
-
Apr 1984
Const.front stairs, install new exit & emergency lighting.
-
Dec 2003
1/f-t.i. interior soft demolition, mew partitions, acoustic ceiling, millwork, doors, hardware & finishes.
-
Jan 2013
Interior ti to include demolition of interior non-structural partitions, new partitions. mep, life safety & fire sprinkler under separate permit.
-
Feb 2013
1st floor t.i. ot include demolitoin of existing office space to be replaced with new office space, gallery space & reconfigured conference areas including non-load bearing partiitons.
-
Feb 2013
Mechanical and electrical work for tenant improvement on the 2nd & 3rd floor. ref arch permit application 201301228380.
-
Feb 2013
Tenant improvement of 7132 gsf consisting of non structural demolition of e office space on 1st floor to be replaced with new office space. work includes new non load bearing partitions and millwork.
-
Mar 2014
Minor remodel existing tenant improvement demolition, construction (2) new rooms & dividing existing conf. room into 2. mechanical/electrical/life safety under seperate permit.
-
Feb 2018
Project consists only of barrier removal. restroom access upgrades. demolition of existing 2nd & 3rd restroom plmg fixture finishes & accessories. new plmg fixture, finishes, and access. existing cieling and lighting fixture to remain. n/a for maher.
-
Nov 2019
2nd & 3rd fl t.i. to include selective demolition and construction of non load bearing partitions, modification of ceiling grid & tile.
-
Nov 2019
Voluntary seismic improvements: wall anchorage & coninuity ties at roof. **maher n/a**.
-
Dec 2019
2nd & 3rd fl - mep for tenant improvement. ref pa 2019-1107-6718.
-
Dec 2019
Suite 120: t.i. to include selective demolition and construction of non load bearing partitons modifications to ceilng grid & tile mep & fire life safety under separate permit. maher n/a.
-
Dec 2019
Tentant improvement on the 1st fl. to include selective demolition and construction of new non load bearning partitions, modification of ceilng and tile. mep under sep permit.
-
Mar 2020
1st fl - mechanical & electrical work for ti at ste 120 ref pa 2019-1230-0889.
-
Jun 2020
Basement: construction of new single user shower and restroom, new valet office and bike room storage at the basement level. maher n/a.
-
Jun 2021
Replace: 1 cooling tower with new of same capacity, 1 boiler with new of the same capacity, 1 primary pump of same capacity, 2 condenser water pumps with new of same capacity.
-
Jul 2025
2nd/f: new demsing wall to separate e) full floor tenant to 2 suites #201 & 202. new pantry & upgrade to e) shower at #202. new floor 2 restroom & building path of travel mep deferred.
-
Aug 2025
3/f: new demising wall to separate existing full floor tenant space into 2 suites (suite 301 and 302). suite 302 - new pantry and upgrades to existing unisex restroom/shower. core area - ada restroom upgrade. mep and fire life safety will be deferred submittal.
-
September 2026
Zurich Investor Pays $47.4M for SF's Old Start-Up Village, Doubling 2024 Price — Hoodline
DBI holds 103 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 103. 1 of them are nominal $1 street-space or sidewalk permits. 7 expired or cancelled permits are not shown.
Nearby
- 370–378 Townsend Street Same street
- 424 Townsend Street Same street
- 690 Fifth Street Same block
- 650–670 Fifth Street Same block
- 135–145 Bluxome Street Same block
- 149 Bluxome Street Same block
- 83–85 Bluxome Street Around the corner