1907
Built as stores and rooming house with 98 rooms and 36 baths, one store occupied as glazing works by, to the design of the architects Ross and Burgren. Four storeys over a basement, brick structure, three-part vertical composition, Renaissance/Baroque ornamentation.
-
March 2, 1907
Isidor Kessel, A. C. Soule Contracting Company, McWhirter & Drake, Edmund Grundy and William Cronan contracted to put up a four-storey and basement brick building.
-
October 1971
The Elk, a residential hotel, had 96 units, of which 1 was vacant.
-
Jun 1983
Additions alterations or repairs.
-
Aug 1988
Parapet reinforcement.
-
Aug 1988
Reroofing.
-
Oct 1988
Revision to exist sprklr system, install 195 sprklrs heads.
-
Dec 1997
Umb.
-
Mar 2001
Revision fc-1 to previously approved app 9725485 deletion of hc toilets.
-
Feb 2003
Revision to prev appl 9725485 and 200103214895 - steel frame relocation - rev fc-3.
-
Mar 2007
Provide shoring and underpinning at the east wall in order to perform earthwork and concrete footing for the 650 eddy street housing project.
-
Jul 2007
Revision to permit application 2007/03/08/5750. change from shotcreke to wood lagging @ east wall to perform earthwork & concrete footing for 650 eddy street housing project.
-
Jul 2007
Revision to permit #200703085750 provide additional underpinning alond 670 eddt street property in oreder to perform earthwork & foundation work w 650 eddy street.
-
Mar 2014
To comply with complaint #201456381, 201454321 and 199710445; install grab bars, all common areas, lavatories & bathing to comply with ord 029-13 (301-505(1)10021g; 21 tub bath, 6 showers, 30 toilets; compliance with ord no 155-13 not required.
-
Oct 2018
Like for like fire system replacement w new control panel and pull station as same location fie in ex bells to new panel. install radio comm monitor module for lsow switch and relay modules for dev recall. will comply with new sffc by 2021 maher not req.
-
May 2019
2nd & 3rd & 4/fl - install metal sheeting metal. galv. sheet to walls with existing garbage room for provide wash/clean purpose.
-
Apr 2022
Remodel shower room. remove rotted sheathing and install new sheathing at shower.
-
Sep 2023
Mod. to an existing f/a system. f/a control panel: existing to remain with sprinkler water flow being monitored to activate the notification devices upon alarm. new lf horns are being installed inside of each sleeping area to comply with sffd 1103.7.6.1 per csfm code interpretation 12-002 and information.
-
May 2024
Legalize a security gate for 678 eddy to comply with planning enf 2024-001411. no work to be performed. scope per planning's.
-
Feb 2025
Comply with a nov #202302022 (ces). remove sign.
-
Jul 2025
To abate nov 202536789 to remove and install drywall due to water damage. walls and ceiling only. all work in bathroom.
-
Sep 2025
Proposed new common kitchen addition within existing lobby/common area at main level floor to single room occupancy to (sro). not removing any residential guest room.
-
Sep 2025
Remove old fan in common area hallway two in each floor, replace in kind.
-
Mar 2026
To obtain final inspection for work approved under permit application 202204071817. all work is complete.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Nearby
- 665–675 Eddy Street Same street
- 691 Eddy Street Same street
- 640–642 Eddy Street Same block
- 726–730 Polk Street Same block
- 765 Ellis Street Same block
- 761–763 Ellis Street Same block
- 652 Polk Street Around the corner
- 650 Polk Street Around the corner