525 Golden Gate Avenue
Tenderloin · San Francisco, CA 94102
-
1887
The 1887 Sanborn map shows most of the block filled with eight row houses or duplexes set slightly back from the street, with shops along Locust Street — now Redwood Street — and at the McAllister and Polk corner. The block now carries the City Administrative Building.
-
1959
A State of California office building went up here in 1959. Its facade and interior were damaged in the 1989 Loma Prieta earthquake, after which the State chose not to repair it and it stood vacant. It was cleared for the City Administrative Building.
-
May 1985
Install halon fire system in computer room.
-
May 1989
This project includes the removal of carpet, acoustical.
-
Aug 2001
Streetspace.
-
Dec 2001
Sidewalk.
-
Dec 2001
To demolish 7 story office building.
-
Dec 2001
Shoring and grading work to follow demolition of building.
-
Aug 2003
Addition of a new story in top, struct & seismic upgrading, recladding, remodel lwr lvl for library.
-
Jun 2010
Erection, use, and dismantling of a tower crane on vacant lot. (building previously demolished under state juristiction, now aquired by puc).
-
2011
Current structure built.
-
Feb 2012
Install 152 micro piles (deep foundation) located at 2 future concrete cores. 2009-puc-002.
-
Feb 2012
Tower crane foundation work. 2010-puc-004.
-
Feb 2012
New 14 story class "a" office building, consist of concrete superstructure with 2 concrete post-tensioned cores including post tensioned floors. sub-sidewalk pge vault and outdoor play area for child care center & is slated to achieve leed platinum status.
-
Apr 2012
Pj 2009-puc-001, micro pile verification program permit.
-
May 2012
Wind tower artwork steel shop drawing and calculation submittal review.
-
Oct 2013
Revision to 201202274953: provide revised evacuation signs with connected exit route on levels 1-14.
-
Dec 2015
1st floor (upper lobby), fire alarm work to add an annunciator in the chief engineer's office. original system was pa 2012-0227-4953, addendum 9.
-
Jun 2016
1st floor: fire alarm ti - addition of magnetic door holder at cafe.
-
Jul 2017
Fire alarm ti 1st fl: add 5 control relay for turnstile interface.
6 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Nearby
- 500 Golden Gate Avenue Same street
- 530 Golden Gate Avenue Same street
- 400 Mcallister Street Same block
- 450 Mcallister Street Same block
- 456 Mcallister Street Same block
- 460 Mcallister Street Same block
- 350 Mcallister Street Around the corner