205 Jones Street
52-unit apartment building
-
1924
Built as the 205 Jones Apartments, stores and apartment building with 50 2-room units, to the design of the architect Edward E. Young. Six storeys over a basement, steel frame structure with brick curtain walls, three-part vertical composition, Renaissance/Baroque ornamentation.
-
Dec 1983
Parapet work.
-
Feb 1987
Rebuild apt. due to fire damage/replace non bearing wall.
-
Feb 1994
Reroofing.
-
Jan 1995
Renovate units, kitchen cabinet, appliances, accessible units.
-
Nov 1995
Minor revision to approved appn #9501177.
-
Dec 1995
Revision to appl #9501177, delete ramp bet grocery & storage.
-
Jan 1996
Install new sprinkler system.
-
Feb 1996
Alteration to permit application 9501177, 9520363. storefront replacement.
-
Feb 1996
Revision to permit application 9501177/addition of laundryrm window.
-
Jun 1996
Revision to 9501177 (eliminate new roof sheathing).
-
Jun 1996
Fire alarm system only.
-
Aug 1996
Revise plans for app #9600382 fire sprinklr system.
-
Nov 2020
Basement - brick repair and skim coat & approximately 2, 340 square feetconcrete wall treatment and skim - approximately 495 square feetrepair concrete slabs - approximately 300 square feetrepair in 5 concrete footings.
-
Feb 2021
Comply with nov#202052931: removal of minimal amount of fire damage, sheetrock to identify existing conditions, patching of all areas where sheetrock was removed and painting over all areas. a total of 19 units: #202, #204, #206#218#302, #304, #306, #318, #402, #404, #418, #502, #504, #506#510, #518, #604, #606 & #618.
-
Apr 2021
100% affordable housing. scope: fire damage repair to two stacks of dwelling units on all seven floors. repair fire damage and return the damaged units to service for the displaced residents. replacement material to be replaced as close to existing as possible. to comply with nov 202052931.
-
Apr 2021
Panel and like for like device replacement.
-
Feb 2022
Elevator upgade, one addressable relay module "emr smoke detector - ifa constrol relay. pme adresseble smoke detector.
-
Feb 2022
Removal of (1) 1/2" hsw from elevator machine room on roof level. 1'0 of 1" piping and 1"x1/2" reducing coupling to be removed so no sprinkler piping is located within the machine room. 1" tee ousite of machine room will be plugged off.
-
Sep 2022
4th floor unit demolition flooring in the bathroom and tear of 20sf drywall: 3rd floor unit demolition drywall in bathroom 100s ceiling and walls: 2nd floor unit demolition drywall in bathroom 100sf ceiling 4 walls. patch and repair in kind after exploratory work done. no alteration to existing fire rated walls.
-
Apr 2023
Water damage repair reinstall drywalls 5/8" for all open areas in-kind. three units office, laundry, small office. all work within residential units. no exterior work. no moving walls. no layout changes.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline. 2 expired permits are not shown.
Nearby
- 132–140 Jones Street Same street
- 219–233 Jones Street Same street
- 218–220 Turk Street Same block
- 241 Jones Street Same block
- 240–242 Turk Street Same block
- 256 Turk Street Same block
- 201–259 Turk Street Around the corner
- 180–194 Turk Street Around the corner