110–130 Geary Street
Union Square · San Francisco, CA 94108
Permit history
-
Jul 1983
Alterations and additions upgrading of existing structures.
-
Jul 1984
Alter exist sprinklers, toilets, electrical, & heating.
-
Sep 1987
Extend lobby entrance out to the property line/revise stair.
-
Dec 1991
Cti-1 2 fl el, sp me.
-
Jan 2000
One-stop ti of existing bsmt, ground floor & mezz in retail space, dis access.
-
Mar 2000
Oti-1 4/f el me ls sp.
-
May 2000
Street space.
-
May 2002
Interior remodel, mechanical, electrical.& lighting. est. renovation to existing store front.
-
Sep 2002
Renovate 1st & basement level retail for new tenant.
-
Sep 2002
New facade architectural & structural interior renovation under seperate permit.
-
Nov 2002
Street space.
-
Sep 2005
Oti-1 3/f el, me, sp, ls.
-
Sep 2005
Oti-2 3rd floor el me.
-
Feb 2013
Interior ti for new retail store on gr floor and basement. work includes new partitions, stairs, bathrooms, fixtures, finihses. new mep, no change of use. facade work and fire protection under separate permit.
-
Nov 2014
Interior demolition at gr fl level to remove previous ti improvements. remove e millwork, lighting, and partitions per plan. no change to egress occupancy or building use. install new flooring, finishes, partitions. install new accessible restroom. new lighting. modify e hvac system. sprinklers under sep.
-
Oct 2015
4th floor tenant improvement to construct new partitions, doors, millwork, ceiling & finishes & mep equipment.
-
Mar 2018
Proposed building facade modification. scope inlcudes window replacement, new entry doors, new security bi-fold gate. sign replacement (separate permit), interior t.i. (work under separate permit).
-
Jun 2018
Core and shell improvement for one new stair, shaft, building a bracing, floor leveling & 2 accessible bathrooms.
-
Jul 2018
Reference feature stair in retail space. reference permit application 201806212572.
-
Aug 2018
Interior t.i. for walls, ceilings, door, millwork, furniture, floor finshes & (2) new accessible bathrooms.
-
Mar 2019
Fire sprinklers for t.i. basement, ground floor, 2nd floor and equp platform. existing main piping beyond area of work are to remain. add 111, relocate and change-out 223 sprinklers.
-
Mar 2019
Elevation restoration/repairs of geary st including: sand stone repair, window/door assembly repair, ornamental cornices, sheet metal coping, sealant and caulking.
-
Aug 2021
T.i.- stair, modification, and associated mep.
-
Apr 2024
Interior tenant improvement at the ground fl. plans include mechanical, electrical, plumbing and structural. no change of use, egress, exit store occupancy.
DBI holds 239 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 239. 10 of them are nominal $1 street-space or sidewalk permits.