152 Geary Street
Union Square · San Francisco, CA 94108
Permit history
-
Aug 1988
Reroofing.
-
Mar 1989
Remove non structural walls and finishes.
-
Mar 1989
Demolition of walls, cut opening in wall, fire door.
-
Mar 1989
Tenant improvement, re arrange interior partitions, lighting.
-
May 1989
Replace the existing awning with a new awning.
-
Oct 1993
Urm upgrade per ordinance 225-92.
-
Sep 1995
Interior impvts for retail store, walls, dressing rms, new floor.
-
Jan 2005
Seismic retrofit on both buildings. addt'l flor on 152, new eleva.
-
Nov 2006
Interior non structural demolition on 3rd floor and basement in advance of full ti. no exterior work.
-
Jan 2007
Seismic upgrade for umb in advance of t.i. under separate permit.
-
Feb 2007
Base building upgrades including n stairs and n elevator, n mechanical, electrical, and plumbing fire protection and tenant improvement under separate permits.
-
Sep 2007
Revision to app. #20070208 3751/ for mechanical, hvac equipment as-builts.
-
Oct 2007
New ground floor storefront on maiden lane. minor facade repairs & repainting of geary st. storefront. no interior or other construction work.
-
Dec 2007
1st & 2nd floor - interior tenant improvement of retail space, construction of new restrooms & changing rooms & new stairs on ground/1st floor, 2nd floor & basement. mep, strul, fire sprinkler to be under separate permit.plus storefront modification.
-
Jan 2008
1st, 2nd, and basement fl - mep for retail space rerouting of existing mechanical., new electrical for retail business. new plumbing for new restrooms. ref. arch p/a #2007.12.12.0279. this application to be checked under 2001 codes.
-
Apr 2008
Install new sprinkler system in the whole building. construct under ground piping to connect city watermain on the sidewalk on mainden ln.
-
Apr 2008
Erect an electric illuminated single faced wall sign.
-
Mar 2009
3rd fl - int. t.i. on 3rd floor, for new retail space work includes new restroom fountain, finishes closet. no exterior work. mep and fire protection under seperate permits.
-
Sep 2010
Revision to permit application 2009.03.09.3662. add 2 ada restrooms. change interior layout incl. new partitions and new finishes. mep and fire under separate permit. no exterior work. changes shown on delta 1, dated 8.27.10.
-
Apr 2015
3rd fl ti selective demolition of non bearing partitons, new millwork at break area. interior work only.
-
Jul 2019
Interior t.i. for new cannabas retail store with existing retail tentant space. work @ ground, 2nd & basement only. wall/doors for (2)new rooms, decoration frams, new display cases, new lighting ground/2nd fl only, security, mesh for select walls/door replacement.
-
Nov 2022
New retail with in existing vacant building. mep included. new fitting rooms, restrooms & partitions. no work on exterior metal panels.
-
May 2023
Revision 202211146477 changes included revised 1st fl layout, new fireplace, n interior tree, changing room locations, 2nd fl restroom layout, updated finishes, mep update. no exterior work.
-
Oct 2024
Install 1 single faced illuminated wall sign "banana republic".
DBI holds 45 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 45. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update