132–140 Geary Street
Union Square · San Francisco, CA 94108
-
1908
Built.
-
1908
Sachs Building, designed by Kenneth MacDonald Jr. and George Adrian Applegarth.
-
Jul 1988
Interior tenant space alternations.
-
Jan 1989
Tenant improvement of hair salon.
-
Jul 1994
Alt to face of bld (historical status).
-
Sep 1994
Structural upgrade, mechanical, electrical, fire alarm.
-
Jun 1995
Retrofit shell building for office use fire sprinklers.
-
Oct 1996
Horizontal addition.
-
Nov 1996
Tenant improv for retail store 1st/2nd floors.
-
Sep 1997
Cti 2 el sp ls me 4th floor.
-
Jan 1998
Cti 1 el me l/s sp 8th floor.
-
Mar 1998
Oti-1 el me sp 7th floor.
-
Apr 1998
Oti-1 5th floor el me l/s sp.
-
Apr 1998
Oti-1 6th floor el me l/s sp.
-
Apr 1998
Oti-1 9thfl, el, me, l/s, lp.
-
Aug 1998
Oti 1-10th floor, el, me, ls & sp.
-
Sep 1998
Oti i - 3rd floor el-me-l/s sp.
-
Dec 1998
Oti-2 10thfl, el, me, l/sp sp.
-
Jul 2000
One stop- 1st and 2nd floor only interior renovation no lighting or mechanical under this permit.
-
Feb 2003
1st and 2nd floor installation of 2 partitions and doors as shown on plans.
-
Dec 2003
Oti 9th fl el ls sp.
-
May 2010
Interor of existing retail space. new structural & non-structural partitions & finishes. new mechanical, electrical & plumbing. no exterior work. fire alarm & sprinkler work under separate permit.
-
Jul 2013
8th floor: interior remodel of existing office space for use as an office space removal and construction of non structural interior walls, relocation of existing lighting. no new lights, ada compliance upgrade as reasonably feasible. no exterior work. no plmg work, no mechanical work. life safety separate.
-
Nov 2013
5th fl. demolition e carpeting and acoustic ceiling. new carpet and acoustic ceiling. new conference room partitions and doors, replace break room counter and cabinets.
-
Aug 2015
2nd floor: this is a commercial t.i. of a lease space the work includes selective demolition & new construction of partitions, doors, frames, electrical, plumbing & finishes.
-
Jun 2021
Ti of retail store. new floor finishes, ceilings, wall, non bearing partitions, miwwork finishes, lighting, hvac and plumbing fixtures. e storefront window mullions to remain. replace e glazing w new glazing. e entry doors and ext canopy to reamin.
-
Jul 2023
Interior ti retail space including millwork, non load bearing partitions floor, wall and ceiling finishes. ceiling including all ceiling mounted equipment dropped soffits light fixtures, hvac ductwork and equipment.
DBI holds 110 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 110. 2 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 110–130 Geary Street Same street
- 146 Geary Street Same street
- 152 Geary Street Same block
- 140 Maiden Lane Same block
- 134 Maiden Lane Same block
- 118–120 Maiden Lane Same block
- 150 Stockton Street Around the corner
- 51–55 Grant Avenue Around the corner