530–550 Kearny Street
Union Square · San Francisco, CA 94108
-
November 1970
Photographed, showing the Business Branch Library.
-
1975
Built.
-
Dec 1979
Created during job card conversion on: 03/04/83.
-
Aug 1994
Cti1 8th fl sp.
-
Oct 2007
Limited replacement of exterior finish panels cladding and awnings, including rain leaders and lighting.
-
Sep 2011
Additions alterations or repairs.
-
Jan 2012
Commercial ti on 2 floors. minor demolition, new construction work includes partitions, doors/frames, operable partitions, ceiling, finishes. electrical, lighting & mechanical work under separate permit. no changes to structural. fire alarm & sprinkler by deferred submittal - separate permit.
-
Jan 2012
Mechanical, electrical & plumbing work as deferrred submittal to permit application 201201182433. fire alarm & sprinkler under seperate permit.
-
Mar 2012
6th floor-demolition of non-load bearing walls, new construction partitions, frames, ceiling, doors, casework, finishes, electrical & mechanical work. fire alarm, sprinkler under seperate permit.
-
May 2012
Ground floor-tenant improvement on ground floor/add retail space-work includes partitions, doors, frames, ceiling, lighting & finishes. mechanical & electrical deferred submittal. sprinkler & fire alarm under seperate permit.
-
Jun 2012
Interior tenant improvement on 2 floors, minor demolition, new partitions, doors, frames, ceiling, finishes, electrical and mechanical. fire alarm and sprinkler under separate permit.
-
Jun 2012
Tenant improvement in the 7th floor, ste. 700; 7th floor restroom upgrade; minor demolition & new construction; new work includes partitions, doors and frames, finishes, lighting, ceiling, electrical & mechanical. sprinkler & fa under separate permit.
-
Nov 2012
10th floor-minor demolition, new construction-partitions, doors & frames, ceiling, casework, finishes, electrical & mechanical. fire alarm under seperate permit.
-
May 2014
5th floor suite 500 - selective demolitoin & new construction of non-structural interior partitions, doors, electrical, mechanical casework & minor ligting changes. n/a maher ordinance 155-13.
-
Mar 2015
New non-structural interior office partitios, power and comm, reconfiguration of mechanical and electrical systems with suite. maher - not req'd.
-
Nov 2016
Suite #100, ground floor - ti to existing office space demolition of non-structural partitions/non-rated partitions. construction of -nonstructural/non rated partitions. installation of new power/data/security outlets. new lights, new finishes.
-
Apr 2019
9th floor ti- non structural partitions, ceiling tiles and grids, mep included.
-
May 2019
6th fl: ti to include demolition of non-structural partitions, new non-load bearing partitions, ceiling tiles, and grids. mep & fire life safety under separate permit.
-
May 2019
3rd and 4th floors - remove selected non-load bearing partitions, ceiling & assoc framing. installation of new partition, gyp board ceiling, new millwork & appliances. new paint & flooring in selected areas new light fixtures & mep equipments.
-
Jul 2019
Tenant improvement on the 2nd floor to include new non-structural partitions ceilin tile and grids, mep under sep permit.
-
Jan 2020
2nd fl: new lighting upgrades, lighting control upgrades and life safety upgrades. reference p.a. #2019 0722 6477. electrical only.
-
Mar 2020
7th fl - ti to include new non-structural partitions, ceiling tiles and grid, doors and hardware. mep included.
-
Mar 2021
Direct replacement of 1 cooling tower located on roof & 2 pumps in the penthouse.
-
Jun 2025
Level 1 and level 2 - modification of shared space into amenities space including fitness center, showers, lounge, conference, restrooms & corridors. includes demolition of non-structural partitions, doors, ceilings & finishes.
-
Mar 2026
Addition of penthouse roof terrace: new elevator/lobby, restrooms, landscaped area, exterior paver system, outdoor furniture & amenity casework, perimeter fencing, & upgrades to existing exterior stairs & wall finishes. selective demolition of non-structural/structural partitions, floors, doors, ceilings.
-
Apr 2026
Selective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope includes non-structural interior elements such as interior portitions, ceilings, lighting and finishes.
DBI holds 276 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 276. 14 of them are nominal $1 street-space or sidewalk permits. The assessor dates the building to 1975, after this photograph was taken.
Nearby
- 346–362 Kearny Street Same street
- 601 Kearny Street Same street
- 580 California Street Same block
- 615 Sacramento Street Same block
- 530–550 California Street Same block
- 417–425 Montgomery Street Same block
- 696 Sacramento Street Around the corner
- 688–690 Sacramento Street Around the corner