530–550 California Street
Financial District · San Francisco, CA 94104
-
1960
Built.
-
1963
An office building of 1963 by Chris William Runge.
-
Jan 1982
Additions alterations or repairs.
-
Mar 1988
Interior ti, non structural, partitions, suspended ceiling.
-
Nov 1988
Rehabilitation of 550 california street including upgrade.
-
May 2004
Voluntary seismic upgrade. install concrete shear wall and steel braces.ref.appl#200404262238.
-
Aug 2006
Boiler and haeating water addition no increase in office space.
-
Sep 2009
Remove existing chiller and replace with new chiller. add exhaust fan.
-
Aug 2013
7th floor (sacramento tower) full floor t.i. including partitions, ceilings, restroom upgrades, electrical, hvac, plumbing. life safety separate permits.
-
Dec 2013
12th floor: remodel of existing office space: new lighting and finishes for new open office area, offices, conference rooms, copy room and elevator lobby. redo toilet rooms. no new fixtures. no new # of fixtures. compliance with ordinance no. 155-13 not reuqired.
-
Dec 2013
14th floor: remodel of existing office space: new lighting and finishes for new open office area, offices, conference rooms, copy room and elevator lobby. redo toilet rooms. no new fixtures. compliance with ordinance no. 155-13 not required.
-
Nov 2014
Replacement ofexisting 480v bus duct riser distribution system which includes removal of existing service switchboard 3 cables iwth new 480v calbe riser distriburion and switcher. maher/na.
-
Mar 2018
5th floor: remodel of existing office space: new conference rooms, copy areas, mother's room & new studio. new finishes and new led lighting in affected areas.
-
Mar 2018
9th floor: remodel of existing office space: new conference rooms, break room, new finishes & new led lighting in affected areas.
-
Jun 2018
Remodel of existing office space new conference rm, focus, break rm, finishes, and led lights in affected are. n/a maher.
-
Dec 2018
4th floor: remodel of existing office space with new conference rooms. new focus rooms. new break room, new finishes, and led lighting in affected areas. n/a for maher.
-
Apr 2019
3/f: remodel of existing office space on 3rd fl with new conference rooms, new focus rooms, new breakroom, new finishes and new led lighting in affected areas. mep included. maher na.
-
Dec 2020
7th floor. conversion of existing offices / finishes / lighting. new conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.
-
May 2024
8th fl - selective interior demolition of non-structural elements including int partitions, doors, finishes, ceilings, lighting, mechanical & electrical outlets and switches. refer to mechanical & electrical plans. scope also includes rr ada accessibility upgrades. scope of work does not affect fixture quantities, occ load calcs.
-
Sep 2024
Ste 710 - selective interior demolition of non-struc'l elements. new interior partitions, door, finishes, lighting, mechanical & electrical outlets & switches. lfs and fire sprinkler submitted as separate permit. scope does not affect fixture quantities, occupant load, calcs or path of travel. no exterior change to.
-
Oct 2024
Ground floor- ti to build out amenities spaces. no change of occupancy. change of use froim open office to b-office accessory space for non retail office fitness amenities.
-
Apr 2025
10th fl suite 1030: selective interior demolition of non structural elements. new interior partitions, doors, finishes, lighting, mechanical and electrical outlets & switches. refer to mechanical & electrical plans. f/l/s and fire sprinkler drawings submitted under separate permit.
-
Aug 2025
L3 suite #310: office t.i. to demolition and install of new non-structual partitions, millwork, finishes, lighting, outlets. mep deffered. no exterior or structure.
-
Sep 2025
L12m ste 1220 non-structural interior demolition of partitions, finishes, ceilings, lighting and mep. new construction consists of new non-structural partitions, finishes, lighting, ceiling, doors, millwork and mep. renovation to existing restrooms on 12th for ada compliance. no change in fixture quantities.
-
Oct 2025
Work within suite 910, consists of selectives interior demolition of non-structural partiations, doors, finishes, lighting, and mep. new construction of non-structural partitions, doors. finishes, lighting, ceiling, millwork, and mep. mep deferred. no exterior or structural work.
-
Dec 2025
Level 9 suite 910: deferred mep 202510066834.
-
Dec 2025
11th floor: suite #1100: shell consists of selective interior demolition including non-structural partitions. new construction includes interior nonstructural partitions, doors finishes, lighting, electrical, restroom upgrade, a movable partition with structural calculations. mep, fire, sprinkler.
DBI holds 592 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 592. 9 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 433–441 California Street Same street
- 555 California Street Same street
- 580 California Street Same block
- 405 Montgomery Street Same block
- 417–425 Montgomery Street Same block
- 530–550 Kearny Street Same block
- 420 Montgomery Street Around the corner
- 400 Montgomery Street Around the corner