555 California Street
Financial District · San Francisco, CA 94104
Public art
- Transcendence — Masayuki Nagare
Black granite; Located at the west side of elevated plaza; artwork is always accessible.
Installed 1969.
Permit history
-
Sep 1981
Additions alterations or repairs.
-
May 2007
Oti-1, ha 555 owners llc, 32nd floor, el, ls, sp.
-
Dec 2007
18th floor: full floor t.i. for minor demolition, construction new partitions, acoustic ceiling, mep, millwork & finishes. (life safety & sprinklers under separate permit.).
-
Nov 2012
Partial demolition and new fit out of existing tenant. new fit of main reception, restrooms, private offices, pantry, conference and supporting spaces. fire alaarm & sprinkler under separate permis.
-
Jun 2014
35 & 36/f -tenant improvements for morgan stanley including building architectural, mep scope of work. interior renovation & expansion with existing build at 35th fl & 36th fl.
-
Nov 2015
13th floor - demolition existing non-structural partitions, doors/frames, millwork, ceiling grid & tile, lighting, power & finishes. new non-structural partitions, doors/frames, ceilings, lighting. no change in occupancy, no change in floor area. life safety & fire sprinklering is design build under separate.
-
Feb 2016
12th fl. demoltion of existing non-structural partitns, doors/frames, millwork, ceiling grid & tile, lighting, power & finishes. nw non-structural partitions. doors/frames, cieling, lighting, & finishes. no change in occupancy & no change in floor area. l/s, fire sprkl under seprte permit. n/a for maher.
-
Jun 2016
Concourse- non-structural demolition, new non structural partitions, lighting, millwork, finishes. life safety & sprinkler under separate permit. structural scope for pivoting door system and wood slat wall as defferred submittal. no change in occupancy, area or use. n/a ordinance #155-13.
-
Sep 2016
29/f- interior ti of offices, conference rooms, pantry. minor demolition. new drywall partitions, ceiling, mep, millwork & finishes. no exterior, hazmat or structural work.
-
Jun 2019
18th fl - interior ti improvement to existing 18th fl new partitions, doors, walls, ceiling fixture & millwork. meps included. life safety & sprinklers under separate permit.
-
Jun 2021
9/f: full floor single t.i. inlcuding new partitions, lighting and millwork, . no structural work and no change of use. deffered mep work.
-
Jun 2021
8th floor full floor single tenant improvement including new partitions, lighting, and millwork. no structural work. no change of use. deferred mep.
-
Jul 2021
10th floor - t.i. full floor single tenant improvement. new patitions, lightings, and millwork. no structural works and no change of use. deffered mep work.
-
Jul 2021
4th floor: full floor single tenant improvement. including new partitions, lighting and millwork. no structural work and no change of use. deffered mep work.
-
Sep 2021
7/f: full floor single tenant improvement including new partitions, lithgting and millwork. no change ofuse. deffered mep work. maher n/a.
-
Aug 2022
27/f: commercial t.i. new non-structural partitions, new acoustal ceilings, new finishes, new lighting, new restrooms including mep work and new fsd's.
-
Aug 2024
6th/f t.i. included new partitions, lighting, power, furniture, equipment. mep deferred for separate permit app.
-
Oct 2024
T.i. consists of office remodel with new office, meeting room, work rooms, break room, and pantry. new led lighting & finises throughout. d.a. upgrades to restrooms. mechanical work, duct redistribution and addition of equipment electrical work: new led lighting & controls, new isms system.
-
May 2025
52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mep.
-
Oct 2025
23/f: demolition of non-structural partitions and doors/frames, construction of demising partitions, non-rated multi tenant hallway and buildback of restrooms, passenger elevator lobby and freight elevator lobby. no change in occupancy, use or floor area. ref permit application 202508284089.
-
Oct 2025
46/fl- partitions, ceilings, fixtures, finishes and associated mep.
-
Dec 2025
45th fl - tenant improvement partitions, ceiing & finishes.
-
Dec 2025
L41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.
-
Mar 2026
31/fl- remodel existing office space, propsed ti work entails new non bearing partitiosn, millwork, ceiling system with new lighting, power and communication fixtures and furniture systems. floor and wall finishes.
-
Jul 2026
50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demolition permit 202606092855.
DBI holds 2,122 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 2,122. 9 of them are nominal $1 street-space or sidewalk permits.
The Banker's Heart
Masayuki Nagare carved Transcendence from 200 tons of black Swedish granite for A. P. Giannini Plaza. The San Francisco Chronicle columnist Herb Caen gave it the name the city has used since. Nagare was born at Nagasaki on 14 February 1923 and died on 7 July 2018.
The tower was the tallest building west of the Mississippi until the Transamerica Pyramid passed it in 1972. In April 2018 the United States Geological Survey listed it among 39 San Francisco high-rises whose welded steel frames could be compromised in a strong earthquake.
Not yet documented: the developer and the early tenants. Submit an update