300 Montgomery Street
Financial District · San Francisco, CA 94104
-
1918
Built.
-
1922
The Security Pacific Building, designed by architect George Kelham.
-
1950s
Photographed, showing the Bank of America Head Office Building.
-
June 15, 1963
Photographed, showing the Bank of America building.
-
Oct 1981
Additions alterations or repairs.
-
Sep 1990
T/i in ground floor space, extend existing mezz.
-
Oct 1990
Cti-1.
-
Mar 1993
Interior tenant improvement.
-
Mar 1999
Installation of street connection, fire pump and standpipe.
-
Feb 2005
Oti-1, 10th floor, el, me, ls, sp.
-
Mar 2007
Tenant improvement for bank use - 1st floor remodel with int. private offices and public open area with banking area. scope of work includes interior partitons & millwork upgrades.
-
Apr 2009
T.i. at 3rd fl: remodel existing vacant office space, const new offices, confer rm, reception/exhibit area, staff rm, upgrade toilets to comply with ada, demolition at permit application 200808229899, mechanical, electrical sprinkler, life safety under separate permits.
-
Dec 2011
11th floor-interior of commercial t.i. includes-demolition/new partitions, doors, ceiling & some millwork. building entry door ada upgrades & 11th floor public bathroom ada uprgades. electrical & plumbing, hvac to be permitted by sub contractor seperate.
-
Jan 2012
New wall finishes in sales area, employee room and photo area. new millwork in sales area, photo area and employee room. remove existing wet lab photo dept. new refrig. cases in sales area. reconfigure pharmacy and add new patient consultation room. new mechanical. unit on roof and hung from floor deck.
-
Apr 2013
12th floor-demolition work under permit application 2012-0723-5524-interior building shell improvements-work includes new finishes, general lighting, electrical & mechanical, restrooms & disbaled accessibility. m.e.p, life safety, fire sprinklers, security & comm. engineering to be performed as required & sub on sep permit.
-
Jun 2014
2nd floor, ste 200: ref ti 201405155858, install 5 mitsubishi s-series heat pump systems, install one new vav system, redistribute 7 vav systems, install exhaust system for phone server room, start-up, test, balance all hvac systems; maher n/a.
-
Mar 2015
9th fl: interior tenant improvement. new partitions, doors and frames, ceiling, lighiting, finishes, casework, electrical, mechanical, sprinklers and fire alarm on sep permit maher not req.
-
Apr 2015
Tenant improvement work on 11th fl work includes minor demolition, new partitions, doors, frames, finishes, ceiling, lighting. electrical, mechanical, sprinkler under sep permit.
-
Mar 2016
3rd floor, suite 350: commercial ti - new partitions, doors, frames, ceiling, lighting, casework, electrical & mechanical. maher na. mep/fire alarm/sprinklers deferred.
-
Jun 2016
8/f #833- this is a commercial t.i. on a single floor, work includes new partitions, finishes, casework, electrical & plumbing. n/a ordinance #155-13.
-
May 2017
Commerical tenant improvment on single floor. new partitions, doors, frames, ceiling, lighting, finishes, casework, electrical.
-
Jun 2018
5th fl - full floor, single tenant interior improvement. common corridor will be removed as part of the proposed tenant floor occupancy. work includes demolition of partitions, ceilings, millwork and plumbing fixtures. new partitions, doors and frames, ceiling lighting. finishes casework electrical and mechanical.
-
Jun 2019
6/f: demolition of partitions, ceilings, millwork and plumbing fixtures; and additoin of new partitions, doors & frames, cieling, lighting, finishes, carewokd.electrical & mechanical defered.no structural work. resrooms to be ada compliant. maher n/a.
-
Sep 2019
4th fl - interior ti. removal of non-structural partitions. new finishes and lighting. mep, fire, life safety and sprinkler under separate permit.
-
Nov 2019
Suite #200: interior t.i. removal of non structural partitions, new finishes and lighting.
-
Jan 2020
Mechanical for suite 450: furnish & install new air distribution with new air outlets, new air conditioning unit and new return fan. ref permit application 201909091019.
-
Sep 2022
12th fl interior ti consist of new finishes and fixtures. new wall, includes upgrades on electrical and mechanical.
-
Nov 2022
#300: interior t.i. work on a single floor. work includes demolition. new partitions, doors, and frames, casework, finishes, electrical and lighting work.
-
Jun 2023
Basement: replace main circuit breaker equipment & addition of incomer section. 12kamp.
DBI holds 326 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 326. 17 of them are nominal $1 street-space or sidewalk permits. The assessor's roll gives 1918; this address is recorded as built 1922.
Nearby
- 201–265 Montgomery Street Same street
- 315 Montgomery Street Same street
- 340–344 Pine Street Same block
- 330–332 Pine Street Same block
- 433–441 California Street Same block
- 231 Sansome Street Same block
- 369 Pine Street Around the corner
- 555 California Street Around the corner