340–344 Pine Street
Financial District · San Francisco, CA 94104
-
Mar 1982
Additions alterations or repairs.
-
Jul 1986
Tennant imp. work - non structural partitions doors.
-
Jul 1986
Tennant impr. work - non structural partitions, doors.
-
Sep 1993
Cti 1 6th fl (el).
-
Nov 1994
Mezzanine office ti-handicap restroom, handicap elevator.
-
Mar 1996
Upgrade bathrooms to make handicap accessible, remove barrier.
-
Apr 1996
Cti-1 floor 2nd no cti-2.
-
Jul 1996
Cti-1 (el me) 4th fl (suite 400).
-
Feb 2000
Oti 1 me l/s basement.
-
Sep 2000
Tenant improvement remove existing walls construct new walls provide new doors & lighting.
-
Oct 2000
Oti-1, ground fl, el, me, ls, sp.
-
Jan 2001
Install new fire alarm system, monitor new fire pump, remove existing fire alarm system.
-
Nov 2002
Oti-1 3rd floor, el, me, ls, sp.
-
Jun 2004
Oti-1, 6th/fl-el, me, ls, sp.
-
Jul 2004
Oti-2 6/f el, me.
-
Jul 2004
Remodel of existing toilets for compliance electrical plumbing and finishes barrier removal work.
-
Nov 2005
Install aa new wet sprinkler system for 1st and mezzanine floors.
-
Jun 2007
Tenant improvement to existing office space. remove non-structural interior partitions, construct new non-structural partitions, add new electrical for furniture systems. relocate light fixtures (no increase in lighting wattage).
-
Nov 2009
Office ti on 5th fl. construct 2 offices. replace lights, minor electrical, for future work stations. new carpet and paint.
-
Jun 2012
Restroation of the original building facade on pine street with the removal of the gated patio. installation of a new entry & staircase to the basement & construction of new handicap accessible restrooms.
-
Jan 2015
T.i. in basement level, removal of existing full, ceiling height partitions, doors, hardware, casework, toilets. n/a ordinance #155-13.
-
Feb 2015
T.i. includes int. improvements to ground floor and mezz. level. doors. hardware, casework, toilet room, and associated ceilings where occurs. n/a for the maher. no exterior work. compliance with maher ordinance no 155-13 not required.
-
Dec 2016
Removal & replacement of roof top hvac package unit and install ductwork. same location, less wt). n/a maher ordinance.
-
Aug 2019
2nd st - project involves modification of an existing tenant improvement to include selectrive demolition and construction of non load bearing partitions, new office doors and frames, new millwork and sink, new finishes, new ceiling tile & grid and new fixtures.
-
Jan 2020
2nd floor: rev to permit application 201908027712; this project involves modification of an existing t.i. to include selective demolition and construction of non load bearing partitions, new office doors & frames, new finishes and new ceiling tile, grid and fixtures.
-
2024
A statue of William Leidesdorff stands in the lobby of the Selbach and Deans Building.
DBI holds 104 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 104. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update